WELL · 42-311-33833 · DISTRICT 1
Kassner #2
McMullen County · Listo (Wright) field · Vertical
Kassner #2 (API 42-311-33833) is a plugged well in Mcmullen County, plugged May 21, 2010, last operated by Ncey Holdings LLC.
The RRC has issued one drilling permit (amended once), issued July 26, 2005, permitted to 6,165 ft.
It was permitted by Manti Operating Company and has since transferred to Ncey Holdings LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Wales, Wright, Lower Wright, C-25.
Its lease has reported 3.85K barrels of oil since September 2005, last reporting in June 2010.
Operator of record
Permitted by Manti Operating Company; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Feb 8, 2013 · 15 permits on file · (713) 829-0881
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Ncey Holdings LLC |
| Production reports | Century Resources, Inc.through Aug 2008 |
| Latest permit | Manti Operating CompanyJul 26, 2005 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,165
- total depth, ft
- 2
- permits on file
- Jul 26, 2005
- last permit issued
- Aug 31, 2005
- completed
- 3.85K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2005 THROUGH Jun 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Aug 31, 2005
- Shut in
- —
- Plugged
- May 21, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Kassner O-1-14661 | Listo (Wright) | Ncey Holdings, LLC | 1 | 3.85K | 0 | Sep 2005 – Jun 2010 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Manti Operating CompanySep 2005 → Jan 2006
- 2Century Resources, Inc.Mar 2007 → Aug 2008
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 603957-98 | Drill | Manti Operating Company | Feb 17, 2006 | Jul 26, 2005 | Jul 24, 2005 | 6,165 |
| 603957-99 | Drill | Manti Operating Company | Jul 25, 2005 | Jul 26, 2005 | Jul 24, 2005 | 5,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-14661 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 290 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wales | 5,110 | -4,820 |
| Wright | 5,500 | -5,210 |
| Lower Wright | 5,700 | -5,410 |
| C-25 | 5,920 | -5,630 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,498 | 5,501 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 637 | 12.25 | 252 S |
| 4.5 | 6,165 | 7.875 | 1,290 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 27, 2006 | Dec 15, 2005 | Yes |
| 00 | Mar 22, 2006 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-33833 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-33833 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31133833, documented in the API reference.