WELL · 42-311-33865 · DISTRICT 1

Morrill Sligo #1

Y

McMullen County · Choke Canyon (Sligo) field · Producing  · Directional

Morrill Sligo #1 (API 42-311-33865) is a well in Mcmullen County operated by Petrotx Operating LLC, completed December 16, 2006 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued November 18, 2005, permitted to 15,000 ft.

It was permitted by Delta Exploration Company, Inc. and has since transferred to Petrotx Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Carrizo, Wales, Sligo.

No lease production has been reported under this well’s leases.

Operator of record

Petrotx Operating LLC

Permitted by Delta Exploration Company, Inc.; the EWA schedule now lists a different operator.

Kingwood, TX · P-5 Y, filed Mar 4, 2026 · 1 permits on file · (713) 818-6705

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetrotx Operating LLC
Production reportsPetrotx Operating, LLCthrough Apr 2026
Latest permitDelta Exploration Company, Inc.Nov 18, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,000
total depth, ft
1
permits on file
Nov 18, 2005
last permit issued
Dec 16, 2006
completed
0
cumulative oil, bbl
1.65M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Feb 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 16, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Morrill Sligo G-1-220585Choke Canyon (Sligo)Petrotx Operating, LLC101.65MFeb 2006 – Jul 2026

Gas, mcf lease total

Last 12 months 89,945 · prior 12 28,909(+211%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Delta Exploration Company, Inc.Dec 2006 → Aug 2010
  2. 2Wapiti Operating, LLCSep 2010 → May 2011
  3. 3Cathexis Oil & Gas, LLCJun 2011 → Dec 2014
  4. 4CSL Exploration, LPJan 2015 → Apr 2018
  5. 5Crest Operating CompanyMay 2018 → Jul 2019
  6. 6Petrotx Operating, LLCAug 2019 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
609760-99DrillDelta Exploration Company, Inc.Nov 18, 2005Nov 18, 2005Dec 3, 200515,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-220585————

Formation tops

As filed on W-2/G-1. Subsea from 260 ft elevation.Download CSV →

FormationMD ftSubsea
Carrizo4,063-3,803
Wales6,168-5,908
Sligo13,514-13,254

Perforations

Perforated and open-hole intervals.

FromToType
13,54213,544Perforated
13,54413,546Perforated
13,58013,590Perforated
13,68613,688Perforated
13,68613,708Perforated
13,70613,708Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,19112.252,300 S
713,2508.75720 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 10, 2007Feb 14, 2007—
00Mar 2, 2007Aug 7, 2006Yes
00Oct 31, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31133865, documented in the API reference.