WELL · 42-311-33869 · DISTRICT 1

Peeler #2

Y

McMullen County · Crowther (5600) field · Producing  · Vertical

Peeler #2 (API 42-311-33869) is a well in Mcmullen County operated by Nails Operating Company LLC, completed January 13, 2006 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued December 9, 2005, permitted to 6,500 ft.

It was permitted by Kaler Energy Corp and has since transferred to Nails Operating Company LLC on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

Its lease has reported 77.3K barrels of oil since January 2006, last reporting in July 2026.

Operator of record

Nails Operating Company LLC

Permitted by Kaler Energy Corp; the EWA schedule now lists a different operator.

Hondo, TX · P-5 Y, filed May 4, 2026 · 26 permits on file · (830) 384-9403

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNails Operating Company LLC
Production reportsNails Operating Company LLCthrough Apr 2026
Latest permitKaler Energy CorpDec 9, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,500
total depth, ft
2
permits on file
Dec 9, 2005
last permit issued
Jan 13, 2006
completed
77.3K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 2006 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 13, 2006
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Peeler O-1-14678Crowther (5600)Nails Operating Company LLC177.3K0Jan 2006 – Jul 2026

Oil, barrels lease total

Last 12 months 41 · prior 12 40(+3%)

0246202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Kaler Energy Corp.Jan 2006 → Apr 2020
  2. 2Nails Operating Company LLCOct 2020 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
610785-98DrillKaler Energy CorpMar 10, 2006Dec 9, 2005Dec 22, 20056,350
610785-99DrillKaler Energy CorpDec 9, 2005Dec 9, 2005—6,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-14678————

Formation tops

As filed on W-2/G-1. Subsea from 340 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox6,350-6,010

Perforations

Perforated and open-hole intervals.

FromToType
5,6305,634Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62573512.25300 S
4.56,3387.875435 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Aug 8, 2006Mar 8, 2006Yes
00Apr 4, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31133869, documented in the API reference.