WELL · 42-311-33902 · DISTRICT 4
Hagist Ranch North #1
McMullen County · Hagist Ranch (Wilcox 9300) field · Temp Abandoned · Vertical
Hagist Ranch North #1 (API 42-311-33902) is a well in Mcmullen County operated by Britanco L.L.C., completed November 13, 2006 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit (amended once), issued April 25, 2006, permitted to 8,800 ft.
It was permitted by Devon Energy Production CO, L.P. and has since transferred to Britanco L.L.C. on the wellbore schedule.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Devon Energy Production Co, L.P.; the EWA schedule now lists a different operator.
Falls City, TX · P-5 Y, filed May 4, 2026 · 13 permits on file · (830) 583-5915
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Britanco L.L.C. |
| Production reports | Britanco, L.L.C.through Sep 2015 |
| Latest permit | Devon Energy Production Co, L.P.Apr 25, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,800
- total depth, ft
- 2
- permits on file
- Apr 25, 2006
- last permit issued
- Nov 13, 2006
- completed
- 0
- cumulative oil, bbl
- 338K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 2006 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 13, 2006
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hagist Ranch North G-4-225794 | Hagist Ranch (Wilcox 9300) | Britanco, L.L.C. | 1 | 0 | 338K | Nov 2006 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Devon Energy Production Co, L.P.Nov 2006 → Mar 2014
- 2Britanco, L.L.C.Aug 2015 → Sep 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 617720-98 | Drill | Devon Energy Production Co, L.P. | Dec 12, 2006 | Apr 25, 2006 | Sep 3, 2006 | 8,800 |
| 617720-99 | Drill | Devon Energy Production Co, L.P. | Apr 17, 2006 | Apr 25, 2006 | — | 8,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-225794 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,280 | 8,290 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 2,000 | 12.25 | 940 S |
| 4.5 | 8,824 | 7.875 | 780 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 11, 2007 | Mar 27, 2007 | Yes |
| 00 | Apr 5, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-33902 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-33902 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31133902, documented in the API reference.