WELL · 42-311-34095 · DISTRICT 1
Quintanilla, Paloma Horton #6
McMullen County · Vertical
Quintanilla, Paloma Horton #6 (API 42-311-34095) is a permitted well in Mcmullen County filed by Welhausen Operating Company, LP; no completion report is on file yet.
The RRC has issued 2 drilling permits between 2004 and 2008, permitted to 11,000 ft.
Completion filings report 2 formation tops, including Carrizo, Olmos.
Its lease has reported 325K barrels of oil and 680K mcf of gas since May 2001, last reporting in July 2026. The lease carries 5 wells, so these are lease totals, not this well alone.
Operator of record
Welhausen Operating Company, LP
Beeville, TX · P-5 Y, filed Jul 7, 2017 · 98 permits on file · (361) 362-4560
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | GTG Operating, LLCthrough Feb 2026 |
| Latest permit | Welhausen Operating Company, LPSep 15, 2008 |
- 11,000
- total depth, ft
- 2
- permits on file
- Sep 15, 2008
- last permit issued
- —
- completed
- 325K
- cumulative oil, bbl
- 680K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2001 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 5 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Paloma-Horton Quintanilla O-1-14345 | A.W.P. (Olmos) | GTG Operating, LLC | 5 | 325K | 680K | May 2001 – Jul 2026 |
Oil, barrels lease total
Last 12 months 931 · prior 12 2,737(-66%)
Gas, mcf lease total
Last 12 months 299 · prior 12 3,787(-92%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Welhausen Operating Co., Inc.May 2001 → Oct 2001
- 2Welhausen Operating Company, LPNov 2001 → Dec 2011
- 3Layline Petroleum I, LLCJan 2012 → May 2013
- 4Wapiti Operating, LLCJun 2013 → Mar 2015
- 5Clearly Petroleum, LLCApr 2015 → Apr 2020
- 6GTG Operating, LLCMay 2020 → Feb 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 666329-99 | Drill | Welhausen Operating Company, LP | Jul 9, 2008 | Sep 15, 2008 | Dec 7, 2008 | 11,000 |
| 552293-99 | Drill | Welhausen Operating Company, LP | Oct 14, 2004 | Oct 18, 2004 | — | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-14345 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 292 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,276 | 9,296 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,348 | — | — |
| 9.625 | 1,512 | 12.25 | 495 S |
| 4.5 | 9,579 | 7.875 | 1,440 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 27, 2009 | Apr 8, 2009 | Yes |
| 00 | Jul 28, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-34095 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-34095 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31134095, documented in the API reference.