WELL · 42-311-34710 · DISTRICT 1

Saylee Ranch SWD #1

WaterY

McMullen County · Manti Kudu South field · Injection  · Vertical

Saylee Ranch Swd #1 (API 42-311-34710) is a well in Mcmullen County operated by Saylee Services LLC, completed October 14, 2012 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit (amended twice), issued November 15, 2011, permitted to 10,440 ft.

It was permitted by Corpus Bayside Investments, LLC and has since transferred to Saylee Services LLC on the wellbore schedule.

Completion filings report one formation top, including Wilcox.

No lease production has been reported under this well’s leases.

It holds an active disposal or injection permit, with 2.3M barrels injected in the 12 months reported through January 2026.

Operator of record

Saylee Services LLC

Permitted by Corpus Bayside Investments, LLC; the EWA schedule now lists a different operator.

Tilden, TX · P-5 Y, filed Nov 4, 2025 · (361) 449-6546

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSaylee Services LLC
Production reportsnone
Latest permitCorpus Bayside Investments, LLCNov 15, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,440
total depth, ft
3
permits on file
Nov 15, 2011
last permit issued
Oct 14, 2012
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Oct 14, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Saylee Ranch SWD O-1-16294Manti Kudu SouthSaylee Services, LLC100Oct 2012 – Jul 2026

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
728083-97DrillCorpus Bayside Investments, LLCJul 5, 2012Nov 15, 2011Sep 14, 20127,000
728083-98DrillCorpus Bayside Investments, LLCDec 12, 2011Nov 15, 2011—10,440
728083-99DrillCorpus Bayside Investments, LLCNov 10, 2011Nov 15, 2011Sep 14, 20126,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-16294————

Formation tops

As filed on W-2/G-1. Subsea from 286 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox5,665-5,379
WilcoxUPPER WILCOX——

Perforations

Perforated and open-hole intervals.

FromToType
5,6605,750Perforated
5,6706,206Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,88512.251,615 S
9.6254,8859.625—
76,4178.75390 S
76,4177—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 21, 2026Dec 23, 2025—
00Feb 14, 2013Feb 5, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

2.3M
bbl, last 12 reported months
40M
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000105561H-1 InjectionActive20,0002,8005,600–7,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 2,301,333 · prior 12 2,810,505(-18%)

0200K400K20252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31134710, documented in the API reference.