WELL · 42-311-34940 · DISTRICT 1

Quintanilla ME-You EF #2H

Y

McMullen County · Eagleville (Eagle Ford-1) field · Shut IN  · Horizontal

Quintanilla ME-You EF #2H (API 42-311-34940) is a horizontal well in Mcmullen County operated by El Dorado Gas & Oil Inc., completed February 25, 2013 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit (amended once), issued May 23, 2012, permitted to 12,500 ft.

It was permitted by Swift Energy Operating, LLC and has since transferred to El Dorado Gas & Oil Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.

Its lease has reported 125K barrels of oil and 319K mcf of gas since December 2010, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

EL Dorado Gas & Oil Inc.

Permitted by Swift Energy Operating, LLC; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Aug 4, 2025 · (214) 215-3940

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEL Dorado Gas & Oil Inc.
Production reportsSilverbow Resources Oper, LLCthrough Dec 2017
Latest permitSwift Energy Operating, LLCMay 23, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,500
total depth, ft
2
permits on file
May 23, 2012
last permit issued
Feb 25, 2013
completed
125K
cumulative oil, bbl
319K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 25, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Quintanilla ME-You EF O-1-15366Eagleville (Eagle Ford-1)EL Dorado Gas & Oil, Inc.2125K319KDec 2010 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Swift Energy Operating, LLCDec 2010 → Jun 2017
  2. 2Silverbow Resources Oper, LLCJul 2017 → Dec 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
740661-98DrillSwift Energy Operating, LLCMar 20, 2013May 23, 2012Aug 9, 201212,500
740661-99DrillSwift Energy Operating, LLCMay 14, 2012May 23, 2012Jun 18, 201212,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-15366————

Formation tops

As filed on W-2/G-1. Subsea from 296 ft elevation.Download CSV →

FormationMD ftSubsea
Anacacho10,656-10,360
Austin Chalk11,258-10,962
Eagle Ford11,390-11,094
Eagle FordEAGLEFORD11,390-11,094

Perforations

Perforated and open-hole intervals.

FromToType
11,86116,971Perforated
17,30017,581Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.755,62014.752,787 S
4.517,6508.753,183 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 13, 2013Apr 17, 2013—
00May 13, 2013Jan 31, 2013—
00Jan 25, 2013Nov 1, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31134940, documented in the API reference.