WELL · 42-311-35232 · DISTRICT 1
Wood Unit 1 #2H
McMullen County · Eagleville (Eagle Ford-1) field · Horizontal
Wood Unit 1 #2H (API 42-311-35232) is a horizontal well in Mcmullen County operated by Bhp Billiton Pet(Txla OP) CO, completed March 19, 2013.
The RRC has issued 2 drilling permits between 2012 and 2014, permitted to 14,000 ft.
Completion filings report 3 formation tops, including Anacacho, Austin Chalk, Eagle Ford.
No lease production has been reported under this well’s leases.
Operator of record
Denver, CO · P-5 Y, filed Mar 5, 2021 · 1,287 permits on file · (720) 439-5104
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | BHP Billiton Pet(txla OP) Co |
| Production reports | BPX Operating Companythrough Apr 2026 |
| Latest permit | BHP Billiton Pet(txla OP) CoAug 21, 2014 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 14,000
- total depth, ft
- 2
- permits on file
- Aug 21, 2014
- last permit issued
- Mar 19, 2013
- completed
- 0
- cumulative oil, bbl
- 3.53M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 19, 2013
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Wood Unit 1 G-1-273730 | Hawkville (Eagleford Shale) | BPX Operating Company | 1 | 0 | 3.53M | Jun 2013 – Jul 2026 |
| Wood Unit 1 G-1-271231 | Eagleville (Eagle Ford-1) | Petrohawk Operating Company | 1 | 0 | 0 | Mar 2013 – Jun 2013 |
Gas, mcf lease total
Last 12 months 45,448 · prior 12 52,237(-13%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1BHP Billiton Pet(txla OP) CoJun 2013 → Jul 2019
- 2BPX Operating CompanyAug 2019 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 790769-99 | Recompletion | BHP Billiton Pet(txla OP) Co | Jul 1, 2014 | Aug 21, 2014 | Apr 7, 2013 | 14,000 |
| 753555-99 | Drill | Petrohawk Operating Company | Dec 19, 2012 | Dec 28, 2012 | Jan 29, 2013 | 14,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-271231 | — | — | — | — |
| — | — G-1-273730 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 260 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Anacacho | 11,976 | -11,716 |
| Austin Chalk | 12,488 | -12,228 |
| Eagle FordEAGLEFORD SHALE | 12,568 | -12,308 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,911 | 19,462 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 7.625 | 5,645 | 9.625 | 445 S |
| 9.625 | 5,846 | 12.25 | 1,710 S |
| 5.5 | 10,716 | 8.75 | 775 S |
| 5.5 | 10,816 | 8.75 | 775 S |
| 4.5 | 19,582 | 6.75 | 775 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 1, 2014 | Apr 15, 2014 | Yes |
| 00 | Jan 30, 2014 | May 7, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-311-35232 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-311-35232 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31135232, documented in the API reference.