WELL · 42-313-30501 · DISTRICT 3
Crane #1
Madison County · Madisonville NE (Georgetown) field · Vertical
Crane #1 (API 42-313-30501) is a plugged well in Madison County, plugged March 22, 1996, last operated by M. P. S. Prod. CO..
The RRC has issued 2 drilling permits between 1984 and 1988, permitted to 9,800 ft.
Completion filings report 8 formation tops, including T/Chalk, B/Chalk, Lewisvile, Lewisville.
Its lease has reported 1.18K barrels of oil and 12.4K mcf of gas since January 1993, last reporting in May 1996.
Operator of record
Houston, TX · P-5 Y, filed Apr 4, 1997 · 5 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | M. P. S. Prod. Co. |
| Production reports | M. P. S. Prod. Co.through Feb 1996 |
| Latest permit | M. P. S. Prod. Co.Apr 14, 1988 |
- 9,800
- total depth, ft
- 2
- permits on file
- Apr 14, 1988
- last permit issued
- Mar 17, 1984
- completed
- 1.18K
- cumulative oil, bbl
- 12.4K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH May 1996
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 17, 1984
- Shut in
- —
- Plugged
- Mar 22, 1996
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Crane O-3-20137 | Madisonville (Lewisville, Upper) | M. P. S. Prod. Co. | 1 | 1.18K | 12.4K | Jan 1993 – May 1996 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1M. P. S. Prod. Co.Jan 1993 → Feb 1996
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 344951-99 | Recompletion | M. P. S. Prod. Co. | Apr 8, 1988 | Apr 14, 1988 | — | 9,550 |
| 227625-99 | Drill | Marshall Expl. Inc. | Jan 26, 1984 | Jan 26, 1984 | Jan 28, 1984 | 9,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-3-20137 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 248 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| T/Chalk | 8,154 | -7,906 |
| B/Chalk | 8,480 | -8,232 |
| Lewisvile | 8,710 | -8,462 |
| Lewisville | 8,710 | -8,462 |
| Dexter | 8,967 | -8,719 |
| Buda | 9,300 | -9,052 |
| Del Rio | 9,368 | -9,120 |
| Georgetown | 9,384 | -9,136 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,710 | 8,740 | Perforated |
| 9,441 | 9,487 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,010 | 12.25 | 1,000 S |
| 5.5 | 9,540 | 8.75 | 450 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 27, 1988 | Jun 9, 1988 | Yes |
| 00 | Jun 21, 1988 | — | — |
| 00 | Apr 20, 1984 | Mar 28, 1984 | — |
| 00 | Apr 10, 1984 | Mar 28, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-313-30501 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-313-30501 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31330501, documented in the API reference.