WELL · 42-313-30557 · DISTRICT 3

Slaughter Fannie #1

Plugged

Madison County · Madisonville E. (Georgetown) field  · Vertical

Slaughter Fannie #1 (API 42-313-30557) is a plugged well in Madison County, plugged March 22, 1989, last operated by Threshold Energy Inc..

The RRC has issued one drilling permit, issued January 7, 1985, permitted to 10,500 ft.

It was permitted by Lowmar Exploration Company and has since transferred to Threshold Energy Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Pecan Gap, Austin Chalk, Eagle Ford, Georgetown.

Operator of record

Threshold Energy Inc.

Permitted by Lowmar Exploration Company; the EWA schedule now lists a different operator.

College Sta, TX · P-5 Y, filed Apr 1, 1992 · 8 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleThreshold Energy Inc.
Production reportsnone
Latest permitLowmar Exploration CompanyJan 7, 1985

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,500
total depth, ft
1
permits on file
Jan 7, 1985
last permit issued
May 10, 1984
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 10, 1984
Shut in
—
Plugged
Mar 22, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
263592-99DrillLowmar Exploration CompanyJan 7, 1985Jan 7, 1985Jan 19, 198510,500

Formation tops

As filed on W-2/G-1. Subsea from 292 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap8,024-7,732
Austin Chalk8,320-8,028
Eagle FordEAGLEFORD SHALE8,620-8,328
Georgetown9,602-9,310
Duck Creek9,812-9,520

Perforations

Perforated and open-hole intervals.

FromToType
9,6069,774Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,21312.25765 S
4.59,8217.875730 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 21, 1985May 29, 1985—
00Jun 14, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31330557, documented in the API reference.