WELL · 42-313-30677 · DISTRICT 3
Fuhlberg James Unit C-2 #2
Madison County · Madisonville (Sub-Clark Gas) field · Vertical
Fuhlberg James Unit C-2 #2 (API 42-313-30677) is a plugged well in Madison County, plugged March 23, 1995, last operated by Parten Operating Inc..
The RRC has issued one drilling permit (amended once), issued December 20, 1989, permitted to 10,000 ft.
It was permitted by Parten Oil CO. and has since transferred to Parten Operating Inc. on the wellbore schedule.
Completion filings report 5 formation tops, including Austin Chalk, Sub-Clarksville, Woodbine, Lewisville.
Operator of record
Permitted by Parten Oil Co.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Aug 4, 2025 · 77 permits on file · (936) 348-0149
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Parten Operating Inc. |
| Production reports | Parten Operating Inc.through Dec 1994 |
| Latest permit | Parten Oil Co.Dec 20, 1989 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,000
- total depth, ft
- 2
- permits on file
- Dec 20, 1989
- last permit issued
- Jun 2, 1990
- completed
- 0
- cumulative oil, bbl
- 44.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 1995
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 2, 1990
- Shut in
- —
- Plugged
- Mar 23, 1995
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Fuhlberg, James Unit C-2 G-3-134563 | Madisonville (Sub-Clark, Gas) | Parten Operating Inc. | 1 | 0 | 44.8K | Jan 1993 – Jun 1995 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Parten Oil Co.Jan 1993 → Jan 1994
- 2Parten Operating Inc.Feb 1994 → Dec 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 367734-98 | Drill | Parten Oil Co. | Aug 6, 1990 | Dec 20, 1989 | — | 10,000 |
| 367734-99 | Drill | Parten Oil Co. | Dec 18, 1989 | Dec 20, 1989 | — | 10,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-134563 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 276 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Austin Chalk | 8,114 | -7,838 |
| Sub-Clarksville | 8,430 | -8,154 |
| Woodbine | 8,500 | -8,224 |
| Lewisville | 8,688 | -8,412 |
| Buda | 9,274 | -8,998 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,431 | 8,434 | Perforated |
| 8,442 | 8,445 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,949 | 12.25 | 1,050 S |
| 5.5 | 9,358 | 8.75 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 18, 1990 | Jul 19, 1990 | Yes |
| 00 | Sep 6, 1990 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-313-30677 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-313-30677 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31330677, documented in the API reference.