WELL · 42-313-30719 · DISTRICT 3

Hendrix #1R

Plugged

Madison County  · Vertical

Hendrix #1R (API 42-313-30719) is a plugged well in Madison County, plugged March 13, 1995, last operated by Barrow-Shaver Resources CO..

The RRC has issued 2 drilling permits between 1995 and 1998, permitted to 9,000 ft.

Completion filings report 2 formation tops, including Austin Chalk, Sub-Clarksville.

Its 2 leases have reported 1.15M barrels of oil and 1.5M mcf of gas since July 1995, last reporting in July 2026. The leases carry 36 wells, so these are lease totals, not this well alone.

Operator of record

Barrow-Shaver Resources Co.

Tyler, TX · P-5 Y, filed Feb 4, 2026 · 201 permits on file · (903) 593-5221

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsBarrow-Shaver Resources Co.through Mar 2026
Latest permitBarrow-Shaver Resources Co.Jun 2, 1998
9,000
total depth, ft
2
permits on file
Jun 2, 1998
last permit issued
—
completed
1.15M
cumulative oil, bbl
1.5M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Mar 13, 1995

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 36 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
BSR (Subclarksville) O-3-24292BSR (Sub-Clarksville)Barrow-Shaver Resources Co.32782K999KDec 2002 – Jul 2026
Hendrix O-3-22760BSR (Sub-Clarksville)Barrow-Shaver Resources Co.4372K498KJul 1995 – Feb 2003

Oil, barrels lease total

Last 12 months 19,725 · prior 12 15,206(+30%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 32,021 · prior 12 15,059(+113%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Barrow-Shaver Resources Co.Jul 1995 → Mar 2026
  2. 2Texas Presco, Inc.Jun 2017 → Aug 2020
  3. 3Stallion Operating, LLCSep 2020 → Jan 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
476783-99ReenterBarrow-Shaver Resources Co.Jun 2, 1998Jun 2, 1998Jun 17, 19998,000
433100-99DrillBarrow-Shaver Resources Co.Feb 21, 1995Feb 21, 1995Feb 26, 19959,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-22760————
—— O-3-24292————

Formation tops

As filed on W-2/G-1. Subsea from 341 ft elevation.Download CSV →

FormationMD ftSubsea
Austin ChalkTOP AUSTIN CHALK7,450-7,109
Sub-ClarksvilleTOP SUB-CLARKSVILLE7,780-7,439

Perforations

Perforated and open-hole intervals.

FromToType
7,7827,802Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62593011230 S
5.57,9957.875350 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 15, 2003Jul 30, 1999—
00Oct 8, 1999Jul 30, 1999—
00Sep 15, 1999——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

80.9K
bbl, last 12 reported months
3.35M
bbl, all reported
Apr 2011
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000088980H-1 InjectionPlugged Dec 27, 20103,0003,8007,782–7,804

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 80,872 · prior 12 360,680(-78%)

020K40K60K20102011

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31330719, documented in the API reference.