WELL · 42-313-30727 · DISTRICT 3

BSR (Subclarksville) #3

N

Madison County · BSR (Sub-Clarksville) field  · Vertical

Bsr (Subclarksville) #3 (API 42-313-30727) is a disposal or injection well in Madison County operated by Barrow-Shaver Resources CO. under an active UIC permit.

The RRC has issued one drilling permit, issued February 20, 1996, permitted to 7,800 ft.

Completion filings report 3 formation tops, including Austin Chalk, Sub-Clarksville, Subclarksville.

Its 3 leases have reported 1.15M barrels of oil and 1.5M mcf of gas since July 1995, last reporting in July 2026. The leases carry 37 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 32K barrels injected in the 12 months reported through December 2025.

Operator of record

Barrow-Shaver Resources Co.

Tyler, TX · P-5 Y, filed Feb 4, 2026 · 201 permits on file · (903) 593-5221

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBarrow-Shaver Resources Co.
Production reportsBarrow-Shaver Resources Co.through Mar 2026
Latest permitBarrow-Shaver Resources Co.Feb 20, 1996
7,800
total depth, ft
1
permits on file
Feb 20, 1996
last permit issued
—
completed
1.15M
cumulative oil, bbl
1.5M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1995 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 37 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
BSR (Subclarksville) G-3-292605BSR (Sub-Clarksville)Barrow-Shaver Resources Co.101.94KJul 2021 – Jul 2026
BSR (Subclarksville) O-3-24292BSR (Sub-Clarksville)Barrow-Shaver Resources Co.32782K999KDec 2002 – Jul 2026
Hendrix O-3-22760BSR (Sub-Clarksville)Barrow-Shaver Resources Co.4372K498KJul 1995 – Feb 2003

Oil, barrels lease total

Last 12 months 19,725 · prior 12 15,206(+30%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 32,021 · prior 12 15,642(+105%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Barrow-Shaver Resources Co.Jul 1995 → Mar 2026
  2. 2Texas Presco, Inc.Jun 2017 → Aug 2020
  3. 3Stallion Operating, LLCSep 2020 → Jan 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
444939-99DrillBarrow-Shaver Resources Co.Feb 20, 1996Feb 20, 1996Feb 20, 19967,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-292605————
—— O-3-22760————
—— O-3-24292————

Formation tops

As filed on W-2/G-1. Subsea from 354 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk7,400-7,046
Austin ChalkTOP AUSTIN CHALK7,400-7,046
Sub-Clarksville7,710-7,356
Subclarksville7,710-7,356
Sub-ClarksvilleTOP SUB CLARKSVILLE7,710-7,356

Perforations

Perforated and open-hole intervals.

FromToType
7,7107,738Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62580311231 S
5.57,7657.875875 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 20, 2025Aug 7, 2025Yes
00Jun 16, 2022Feb 18, 2022—
00Jan 15, 2003Mar 31, 1997—
00Apr 10, 1997Mar 31, 1997—
00Apr 17, 1996Mar 22, 1996Yes
00Apr 9, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

32K
bbl, last 12 reported months
32K
bbl, all reported
Dec 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000127368H-1 InjectionActive30,0002,0007,710–7,738

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 31,966

010K20K2025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31330727, documented in the API reference.