WELL · 42-313-30818 · DISTRICT 3

James Lang Unit SC #1H

Plugged

Madison County · Madisonville (Sub-Clark Gas) field  · Horizontal

James Lang Unit SC #1H (API 42-313-30818) is a plugged horizontal well in Madison County, plugged October 11, 2024, last operated by Trailblazer Energy Resources LLC.

The RRC has issued one drilling permit (amended twice), issued February 9, 2007, permitted to 8,500 ft.

It was permitted by Martineau Petroleum, Inc. and has since transferred to Trailblazer Energy Resources LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Austin Chalk, Sub-Clarksville.

Operator of record

Trailblazer Energy Resources LLC

Permitted by Martineau Petroleum, Inc.; the EWA schedule now lists a different operator.

Tulsa, OK · P-5 Y, filed Aug 4, 2025 · 30 permits on file · (866) 598-1407

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTrailblazer Energy Resources LLC
Production reportsNew Gulf Resources, LLCthrough Aug 2015
Latest permitMartineau Petroleum, Inc.Jan 16, 2009

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,500
total depth, ft
3
permits on file
Jan 16, 2009
last permit issued
Apr 6, 2007
completed
0
cumulative oil, bbl
160K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2007 THROUGH Nov 2024

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 6, 2007
Shut in
—
Plugged
Oct 11, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
James Lang Unit SC G-3-246813Madisonville (Sub-Clark, Gas)Trailblazer Energy Resources,llc10160KApr 2007 – Nov 2024

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Martineau Petroleum, Inc.May 2007 → Jul 2010
  2. 2Southern Bay Operating, L.L.C.Aug 2010 → Jun 2013
  3. 3HK Energy Operating, LLCJul 2013 → Apr 2014
  4. 4New Gulf Resources, LLCMay 2014 → Aug 2015

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
633105-97DrillMartineau Petroleum, Inc.Oct 20, 2009Jan 16, 2009Feb 13, 20078,500
633105-98DrillMartineau Petroleum, Inc.Dec 10, 2008Jan 16, 2009Feb 13, 20078,500
633105-99DrillB.W.O.C., Inc.Feb 6, 2007Feb 9, 2007Feb 13, 20078,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-246813————

Formation tops

As filed on W-2/G-1. Subsea from 270 ft elevation.Download CSV →

FormationMD ftSubsea
Austin ChalkTOP AUSTIN CHALK8,070-7,800
Austin ChalkBASE AUSTIN CHALK8,382-8,112
Sub-ClarksvilleTOP SUB-CLARKSVILLE8,403-8,133
Sub-ClarksvilleBASE SUB-CLARKSVILLE8,415-8,145

Perforations

Perforated and open-hole intervals.

FromToType
8,6778,796Perforated
8,6778,814Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6253,65012.251,560 S
5.58,8027.875281 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 27, 2009Nov 19, 2008Yes
00May 5, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31330818, documented in the API reference.