WELL · 42-313-30899 · DISTRICT 3

Santa Elena Gas Unit #1

Plugged

Madison County · Fort Trinidad East (Georgetown) field  · Vertical

Santa Elena Gas Unit #1 (API 42-313-30899) is a plugged well in Madison County, plugged April 9, 2026, last operated by Reed Exploration LLC.

The RRC has issued one drilling permit (amended once), issued October 25, 2011, permitted to 15,500 ft.

It was permitted by Burk Royalty CO., Ltd. and has since transferred to Reed Exploration LLC on the wellbore schedule.

Completion filings report 8 formation tops, including Woodbine, Dexter, Buda, Georgetown.

Operator of record

Reed Exploration LLC

Permitted by Burk Royalty Co., Ltd.; the EWA schedule now lists a different operator.

Midland, TX · P-5 Y, filed Feb 4, 2026 · (432) 661-7139

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleReed Exploration LLC
Production reportsBuffalo Xxii Operating, LLCthrough Feb 2023
Latest permitBurk Royalty Co., Ltd.Oct 25, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

15,500
total depth, ft
2
permits on file
Oct 25, 2011
last permit issued
Aug 26, 2013
completed
0
cumulative oil, bbl
298K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 26, 2013
Shut in
—
Plugged
Apr 9, 2026

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Santa Elena Gas Unit G-3-276756Fort Trinidad (Glen Rose, Upper)Reed Exploration LLC10298KMar 2014 – Jul 2026
Santa Elena Gas Unit G-3-276819Fort Trinidad, East (Georgetown)Reed Exploration LLC100Aug 2013 – Mar 2026
Santa Elena Gas Unit G-3-276826Fort Trinidad, East (Buda)Reed Exploration LLC100Aug 2013 – Mar 2026
Santa Elena Gas Unit G-3-276852FT Trinidad, E. (Edwards -A-)Reed Exploration LLC100Aug 2013 – Mar 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Burk Royalty Co., Ltd.Mar 2014 → Jun 2020
  2. 2Etx Energy, LLCOct 2020 → Dec 2021
  3. 3Buffalo Xxii Operating, LLCJan 2022 → Feb 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
726734-98DrillBurk Royalty Co., Ltd.Sep 17, 2013Oct 25, 2011Aug 10, 201315,500
726734-99DrillBurk Royalty Co., Ltd.Oct 21, 2011Oct 25, 2011—15,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-276756————
—— G-3-276819————
—— G-3-276826————
—— G-3-276852————

Formation tops

As filed on W-2/G-1. Subsea from 239 ft elevation.Download CSV →

FormationMD ftSubsea
Woodbine9,251-9,012
Dexter9,729-9,490
Buda10,175-9,936
Buda10,178-9,939
Georgetown10,240-10,001
Kiamichi10,607-10,368
Edwards10,675-10,436
Paluxy11,060-10,821
Glen Rose11,255-11,016

Perforations

Perforated and open-hole intervals.

FromToType
10,17510,214Perforated
10,67111,067Perforated
11,37711,848Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,50512.25830 S
5.511,9858.751,270 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 11, 2015Feb 24, 2015—
00Jun 9, 2015Feb 24, 2015—
00Jun 8, 2015Feb 24, 2015—
00Jun 1, 2015Feb 24, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31330899, documented in the API reference.