WELL · 42-313-30912 · DISTRICT 3

N.G.R. Gaylor #1

N

Madison County  · Vertical

N.G.R. Gaylor #1 (API 42-313-30912) is a permitted well in Madison County filed by Etx Energy, LLC; no completion report is on file yet.

The RRC has issued 4 drilling permits (amended once) between 2012 and 2016, permitted to 12,000 ft.

Completion filings report 6 formation tops, including Austin Chalk, Woodbine, Buda, George Town.

Its 2 leases have reported 248K barrels of oil and 664K mcf of gas since November 2012, last reporting in July 2026. The leases carry 5 wells, so these are lease totals, not this well alone.

Operator of record

Etx Energy, LLC

Tulsa, OK · P-5 Y, filed Apr 6, 2023 · 38 permits on file · (866) 598-1407

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsDeguello Operating LLCthrough Apr 2024
Latest permitEtx Energy, LLCSep 9, 2016
12,000
total depth, ft
5
permits on file
Sep 9, 2016
last permit issued
—
completed
248K
cumulative oil, bbl
664K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 5 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
N.G.R.-Gaylor O-3-26524Fort Trinidad, East (Buda)Deguello Operating LLC4248K664KNov 2012 – Jul 2026
N.G.R.-Gaylor O-3-26562WildcatNew Gulf Resources, LLC100Jan 2013 – Feb 2015

Oil, barrels lease total

Last 12 months 0 · prior 12 0

0204060202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1New Gulf Resources, LLCNov 2012 → Jul 2016
  2. 2Etx Energy, LLCAug 2016 → Apr 2021
  3. 3Deguello Operating LLCMay 2021 → Apr 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
818313-99RecompletionEtx Energy, LLCSep 7, 2016Sep 9, 2016—9,000
810126-99RecompletionNew Gulf Resources, LLCSep 8, 2015Sep 16, 2015—11,800
803606-99RecompletionNew Gulf Resources, LLCFeb 6, 2015Feb 17, 2015Sep 11, 201212,000
732742-98DrillNew Gulf Resources, LLCMar 10, 2014Feb 13, 2012May 12, 201212,000
732742-99DrillNew Gulf Resources, LLCJan 31, 2012Feb 13, 2012May 12, 201212,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-3-26524————
—— O-3-26562————

Formation tops

As filed on W-2/G-1. Subsea from 161 ft elevation.Download CSV →

FormationMD ftSubsea
Austin Chalk7,645-7,484
Austin ChalkBASE AUSTIN CHALK7,970-7,809
WoodbineTOP OF WOODBINE8,423-8,262
BudaTOP OF BUDA9,002-8,841
George Town9,075-8,914
Edwards9,628-9,467
Glen RoseGLEN ROSE "A"10,167-10,006
Glen RoseGLEN ROSE "C"10,476-10,315
Glen RoseGLEN ROSE "D"10,594-10,433

Perforations

Perforated and open-hole intervals.

FromToType
9,0069,042Perforated
9,0069,043Perforated
9,6429,839Perforated
10,37211,042Perforated
11,28611,624Perforated
11,70211,714Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,23112.25823 S
9.6252,23212.25823 S
5.511,8008.751,080 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 30, 2016Feb 20, 2015—
00Feb 20, 2015Mar 8, 2013—
00Feb 11, 2015Feb 2, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31330912, documented in the API reference.