WELL · 42-313-30934 · DISTRICT 5

Jack Howe #1H

Y

Madison County · Aguila Vado (Eagleford) field · Producing  · Horizontal

Jack Howe #1H (API 42-313-30934) is a horizontal well in Madison County operated by Giant Nrg CO. LP, completed December 7, 2021 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit (amended 3 times), issued June 26, 2012, permitted to 8,490 ft.

It was permitted by Sun Operating LLC and has since transferred to Giant Nrg CO. LP on the wellbore schedule.

Completion filings report 14 formation tops, including Midway, Navarro, Pecan Gap, Austin Chalk.

Its lease has reported 76.1K barrels of oil since November 2015, last reporting in July 2026.

Operator of record

Giant NRG Co. LP

Permitted by Sun Operating LLC; the EWA schedule now lists a different operator.

Dallas, TX · P-5 Y, filed Jun 4, 2026 · 3 permits on file · (800) 899-2581

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleGiant NRG Co. LP
Production reportsGiant NRG Co., LPthrough Apr 2026
Latest permitTanglewood Oil & Gas LLCJun 26, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,490
total depth, ft
4
permits on file
Jun 26, 2012
last permit issued
Dec 7, 2021
completed
76.1K
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 7, 2021
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jack Howe O-5-4328Aguila Vado (Eagleford)Giant NRG Co., LP176.1K0Nov 2015 – Jul 2026

Oil, barrels lease total

Last 12 months 11,878 · prior 12 14,422(-18%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Giant NRG Co., LPJun 2022 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
743130-96DrillSun Operating LLCMar 23, 2017Jun 26, 2012Apr 15, 20148,490
743130-97DrillSun Operating LLCApr 10, 2014Jun 26, 2012Apr 15, 20148,490
743130-98DrillAmerril Energy LLCApr 12, 2013Jun 26, 2012—8,490
743130-99DrillTanglewood Oil & Gas LLCJun 19, 2012Jun 26, 2012—8,490

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-5-4328————

Formation tops

As filed on W-2/G-1. Subsea from 324 ft elevation.Download CSV →

FormationMD ftSubsea
Midway4,522-4,198
NavarroNAVARRO CHALK5,662-5,338
Pecan Gap6,557-6,233
Austin Chalk7,247-6,923
Sub-Clarksville7,643-7,319
Eagle FordEAGLEFORD7,964-7,640
Woodbine8,066-7,742
BudaBUDA - DISPOSAL8,121-7,797
Georgetown8,122-7,798
Dex-Buda——
FrioFRIO - DISPOSAL——
Lewisville - Disposal——
RodessaRODESSA - H2S——
WilcoxWILCOX - DISPOSAL——

Perforations

Perforated and open-hole intervals.

FromToType
8,55214,630Perforated
14,40314,630Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.754,65313.52,434 S
5.514,7078.753,242 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Apr 6, 2023Jan 4, 2023—
00Dec 7, 2017Mar 31, 2017Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31330934, documented in the API reference.