WELL · 42-313-31056 · DISTRICT 3

Vivienne #1

Y

Madison County · Fort Trinidad East (Buda) field · SWR-10-Well  · Vertical

Vivienne #1 (API 42-313-31056) is a well in Madison County operated by E2 Operating LLC, completed December 2, 2013 and listed as swr-10-well on the RRC schedule.

The RRC has issued one drilling permit, issued November 15, 2013, permitted to 13,000 ft.

It was permitted by Burk Royalty CO., Ltd. and has since transferred to E2 Operating LLC on the wellbore schedule.

Completion filings report 11 formation tops, including Pecan Gap, Austin Chalk, Woodbine, Dexter.

No lease production has been reported under this well’s leases.

Operator of record

E2 Operating LLC

Permitted by Burk Royalty Co., Ltd.; the EWA schedule now lists a different operator.

Tulsa, OK · P-5 Y, filed Mar 4, 2026 · (918) 270-9927

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleE2 Operating LLC
Production reportsE2 Operating LLCthrough Sep 2023
Latest permitBurk Royalty Co., Ltd.Nov 15, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
1
permits on file
Nov 15, 2013
last permit issued
Dec 2, 2013
completed
0
cumulative oil, bbl
118K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 2, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Vivienne G-3-274572Fort Trinidad (Glen Rose, Upper)E2 Operating LLC10118KDec 2013 – Jul 2026
Vivienne G-3-274635Fort Trinidad, East (Georgetown)E2 Operating LLC100Dec 2013 – Jul 2026
Vivienne G-3-274730FT Trinidad, E. (Edwards -A-)E2 Operating LLC100Dec 2013 – Jul 2026
Vivienne G-3-274746Fort Trinidad, East (Buda)E2 Operating LLC100Dec 2013 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

01202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Burk Royalty Co., Ltd.Feb 2014 → Feb 2023
  2. 2E2 Operating LLCSep 2023 → Sep 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
773292-99DrillBurk Royalty Co., Ltd.Nov 6, 2013Nov 15, 2013Nov 18, 201313,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-274572————
—— G-3-274635————
—— G-3-274730————
—— G-3-274746————

Formation tops

As filed on W-2/G-1. Subsea from 271 ft elevation.Download CSV →

FormationMD ftSubsea
Pecan Gap7,853-7,582
Austin Chalk8,538-8,267
Woodbine8,850-8,579
Dexter9,380-9,109
Buda9,761-9,490
Georgetown9,850-9,579
Goergetown9,850-9,579
Kiamichi10,267-9,996
Edwards10,291-10,020
Paluxy10,740-10,469
Glen Rose10,904-10,633

Perforations

Perforated and open-hole intervals.

FromToType
9,7619,829Perforated
9,8659,898Perforated
10,27910,716Perforated
11,04211,603Perforated
11,04311,603Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,19012.25750 S
9.6252,19012.75750 S
5.511,6728.75979 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 21, 2014May 9, 2014Yes
00Nov 20, 2014May 9, 2014Yes
00Nov 19, 2014May 9, 2014Yes
00Nov 12, 2014Apr 28, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31331056, documented in the API reference.