WELL · 42-315-00276 · DISTRICT 6

Cromer Alma Preston #2

N

Marion County · Rodessa (Travis Peak) field  · Vertical

Cromer Alma Preston #2 (API 42-315-00276) is a well in Marion County operated by Nadel And Gussman L.L.C., completed June 1, 1989.

The RRC has issued one drilling permit, issued October 8, 2003, permitted to 7,207 ft.

No lease production has been reported under this well’s leases.

Operator of record

Nadel and Gussman L.L.C.

Tulsa, OK · P-5 Y, filed May 4, 2026 · 37 permits on file · (918) 583-3333

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNadel and Gussman L.L.C.
Production reportsFaulconer Energy, LLCthrough Oct 2025
Latest permitNadel and Gussman, L.L.C.Oct 8, 2003

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,207
total depth, ft
1
permits on file
Oct 8, 2003
last permit issued
Jun 1, 1989
completed
0
cumulative oil, bbl
1.2M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 1, 1989
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cromer G-6-198434Rodessa (Pettit Lower)Faulconer Energy, LLC10710KOct 2003 – Jul 2026
Cromer, Alma Preston G-6-16653Rodessa (Travis Peak)Nadel and Gussman, L.L.C.10493KJan 1993 – Feb 2004

Gas, mcf lease total

Last 12 months 21 · prior 12 453(-95%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Arkla Exploration Co.Jan 1993 → Jan 1993
  2. 2Seagull Mid-South, Inc.Feb 1993 → May 1998
  3. 3Seagull Energy E&P Inc.Jun 1998 → Oct 2000
  4. 4Ocean Energy, Inc.Nov 2000 → Oct 2002
  5. 5Nadel & GussmanNov 2002 → Mar 2003
  6. 6Nadel and Gussman, L.L.C.Apr 2003 → Dec 2007
  7. 7XTO Energy Inc.Jan 2008 → Mar 2023
  8. 8Faulconer Energy, LLCApr 2023 → Oct 2025

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
537075-99RecompletionNadel and Gussman, L.L.C.Oct 2, 2003Oct 8, 2003Oct 8, 20037,207

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-16653————
—— G-6-198434————

Perforations

Perforated and open-hole intervals.

FromToType
6,4206,446Perforated
6,5156,555Perforated
6,7006,703Perforated
6,8587,116Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,47612.25600 S
5.57,1608.751,050 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 9, 2004Oct 29, 2003Yes
00Jan 14, 2004——
00Jul 13, 1989Jun 16, 1989—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31500276, documented in the API reference.