WELL · 42-315-30525 · DISTRICT 6
Key, David R. #1D
Marion County · Vertical
Key, David R. #1D (API 42-315-30525) is a plugged well in Marion County, plugged April 16, 1979, last operated by Tank Trucks, Inc..
The RRC has issued 2 drilling permits between 1979 and 1981, permitted to 10,718 ft.
Completion filings report 3 formation tops, including Pecan Chalk, Austin Chalk, Georgetown.
Operator of record
Kilgore, TX · P-5 Y, filed Sep 17, 1986 · 1 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Tank Trucks, Inc.Jun 2, 1981 |
- 10,718
- total depth, ft
- 2
- permits on file
- Jun 2, 1981
- last permit issued
- —
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Dec 2004
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Apr 16, 1979
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Key, David R. G-6-100193 | Woodlawn (Cotton Valley) | Key Energy Services, Inc-Altd | 1 | 0 | 0 | Jan 1993 – Dec 2004 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 121423-99 | Other | Tank Trucks, Inc. | Jun 2, 1981 | Jun 2, 1981 | — | 3,680 |
| 42420-99 | Drill | McBrayer Oil Corporation | Feb 12, 1979 | Feb 12, 1979 | Mar 10, 1979 | 10,718 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-6-100193 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 195 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Pecan Chalk | 1,830 | -1,635 |
| Austin Chalk | 2,460 | -2,265 |
| GeorgetownGEORGETOWN LIME | 2,900 | -2,705 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,273 | 3,280 | Perforated |
| 3,559 | 3,573 | Perforated |
| 3,559 | 3,595 | Perforated |
| 3,585 | 3,595 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,500 | — | — |
| 8.625 | 2,420 | 12.5 | 1,490 S |
| 2.5 | 3,250 | — | — |
| 8.625 | 3,920 | 12.25 | — |
| — | 3,920 | — | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 15, 2001 | Aug 20, 2001 | — |
| 00 | Mar 18, 1986 | Feb 28, 1986 | — |
| 00 | Jan 12, 1984 | Jul 20, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-315-30525 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-315-30525 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 2.73M
- bbl, all reported
- Nov 2004
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000044223 | W-14 Disposal | Plugged Jan 20, 2005 | 10,000 | 1,600 | 3,200–3,595 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31530525, documented in the API reference.