WELL · 42-315-30730 · DISTRICT 6
Chevron Fee #1
Marion County · Kellyville (Hill Lime) field · Vertical
Chevron Fee #1 (API 42-315-30730) is a plugged well in Marion County, plugged August 6, 2019, last operated by Oiltec LP.
The RRC has issued one drilling permit, issued July 28, 1987, permitted to 7,500 ft.
It was permitted by Petrofunds, Inc. and has since transferred to Oiltec LP on the wellbore schedule.
Completion filings report 3 formation tops, including BMA, Rodessa, Pettit.
Its lease has reported 13.3K barrels of oil and 11.8K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Petrofunds, Inc.; the EWA schedule now lists a different operator.
Kilgore, TX · P-5 Y, filed Mar 8, 2019
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Oiltec LP |
| Production reports | Oiltec, LPthrough Mar 2010 |
| Latest permit | Petrofunds, Inc.Jul 28, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,500
- total depth, ft
- 1
- permits on file
- Jul 28, 1987
- last permit issued
- Sep 12, 1987
- completed
- 13.3K
- cumulative oil, bbl
- 11.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 12, 1987
- Shut in
- —
- Plugged
- Aug 6, 2019
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Chevron Fee O-6-12239 | Kellyville (Hill Lime) | Oiltec, LP | 2 | 13.3K | 11.8K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Petrofunds, Inc.Jan 1993 → Jun 1996
- 2L.P. Operating CompanyJul 1996 → Aug 1998
- 3Linop CorporationAug 2001 → Nov 2002
- 4Oiltec, LPDec 2007 → Mar 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 332666-99 | Drill | Petrofunds, Inc. | Jul 9, 1987 | Jul 28, 1987 | — | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-6-12239 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 269 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,138 | 6,142 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,021 | 11 | 295 S |
| 4.5 | 6,291 | 7.875 | 890 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Oct 28, 1987 | Oct 7, 1987 | Yes |
| 00 | Oct 23, 1987 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-315-30730 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-315-30730 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31530730, documented in the API reference.