WELL · 42-315-30781 · DISTRICT 6

Hooper E. S. Oil Unit A #2

Plugged

Marion County · Green Fox E. (Pettit Lower -B-) field  · Vertical

Hooper E. S. Oil Unit A #2 (API 42-315-30781) is a plugged well in Marion County, plugged November 2, 2017, last operated by Texla Operating Company.

The RRC has issued one drilling permit, issued March 27, 1991, permitted to 6,500 ft.

It was permitted by Jamex, Inc. and has since transferred to Texla Operating Company on the wellbore schedule.

Completion filings report 6 formation tops, including Nacatoch, Massive Anhy., Blma Stringer, Rodessa.

Its 2 leases have reported 11.6K barrels of oil and 49.2K mcf of gas since January 1993, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.

Operator of record

Texla Operating Company

Permitted by Jamex, Inc.; the EWA schedule now lists a different operator.

Austin, TX · P-5 Y, filed Jul 4, 2026 · (281) 797-6066

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleTexla Operating Company
Production reportsTexla Operating Companythrough Jan 2012
Latest permitJamex, Inc.Mar 27, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,500
total depth, ft
1
permits on file
Mar 27, 1991
last permit issued
Aug 19, 1991
completed
11.6K
cumulative oil, bbl
49.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 19, 1991
Shut in
—
Plugged
Nov 2, 2017

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hooper, E. S. Oil Unit "A" O-6-13398Green Fox, E. (Pettit Lower -B-)Texla Operating Company17.06K23.3KJan 1995 – Jul 2026
Hooper, E.S. "A" O-6-12897Green Fox, E. (Pettit -B-)Jamex, Inc.24.55K25.8KJan 1993 – Jul 1995

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jamex, Inc.Jan 1993 → Mar 1997
  2. 2Basa Resources, Inc.Apr 1997 → Nov 2000
  3. 3Texla Operating CompanyOct 2010 → Jan 2012

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
385502-99DrillJamex, Inc.Mar 11, 1991Mar 27, 1991Jul 16, 19916,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-6-12897————
—— O-6-12897————
—— O-6-13398————

Formation tops

As filed on W-2/G-1. Subsea from 189 ft elevation.Download CSV →

FormationMD ftSubsea
Nacatoch861-672
Massive Anhy.4,265-4,076
Blma Stringer4,866-4,677
RodessaRODESSA LM.5,001-4,812
PettitPETTET LM.5,581-5,392
Travis Peak5,819-5,630

Perforations

Perforated and open-hole intervals.

FromToType
5,9325,944Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62540212.25213 S
4.56,5007.875809 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 18, 1995Aug 29, 1991Yes
00Nov 19, 1991Aug 29, 1991Yes
00Nov 12, 1991——
00Oct 30, 1991——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31530781, documented in the API reference.