WELL · 42-315-30894 · DISTRICT 6

Templeton #1

Plugged

Marion County · Wildcat field  · Vertical

Templeton #1 (API 42-315-30894) is a plugged well in Marion County, plugged June 8, 2005, last operated by Camterra Resources Inc..

The RRC has issued one drilling permit, issued June 11, 2003, permitted to 11,500 ft.

Completion filings report 6 formation tops, including T/Massive Anhyd., B/Massive Anhyd., T/James, T/Sh60.

Operator of record

Camterra Resources Inc.

Marshall, TX · P-5 Y, filed Feb 4, 2026 · 38 permits on file · (800) 261-3282

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleCamterra Resources Inc.
Production reportsnone
Latest permitCamterra Resources, Inc.Jun 11, 2003
11,500
total depth, ft
1
permits on file
Jun 11, 2003
last permit issued
Sep 22, 2003
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Sep 2003 THROUGH Jun 2005

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 22, 2003
Shut in
—
Plugged
Jun 8, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Templeton G-6-199487WildcatCamterra Resources, Inc.100Sep 2003 – Jun 2005

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
532915-99DrillCamterra Resources, Inc.Jun 9, 2003Jun 11, 2003Jul 6, 200311,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-6-199487————

Formation tops

As filed on W-2/G-1. Subsea from 315 ft elevation.Download CSV →

FormationMD ftSubsea
T/Massive Anhyd.6,575-6,260
B/Massive Anhyd.6,698-6,383
T/James7,223-6,908
T/SH607,412-7,097
T/Travis Peak7,582-7,267
T/Cotton Valley9,380-9,065

Perforations

Perforated and open-hole intervals.

FromToType
11,07211,082Perforated
11,08611,096Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,03312.251,024 S
5.511,2487.8751,850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 3, 2004Jan 15, 2004Yes
00Mar 3, 2004——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31530894, documented in the API reference.