WELL · 42-317-00059 · DISTRICT 8

Burdine Heirs #2

Y

Martin County · Jack Black (Cisco) field · Shut IN  · Directional

Burdine Heirs #2 (API 42-317-00059) is a well in Martin County operated by Rmb Operating LLC, completed July 17, 1995 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued June 5, 1995, permitted to 9,800 ft.

It was permitted by Mcshane, J. Inc. and has since transferred to Rmb Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Spraberry, Dean, Pennsylvanian.

Its lease has reported 74.5K barrels of oil and 67.1K mcf of gas since August 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

RMB Operating LLC

Permitted by McShane, J. Inc.; the EWA schedule now lists a different operator.

Lubbock, TX · P-5 Y, filed Nov 4, 2025 · 5 permits on file · (435) 935-3998

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRMB Operating LLC
Production reportsChesapeake Operating, Inc.through Aug 2011
Latest permitMcShane, J. Inc.Jun 5, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,800
total depth, ft
1
permits on file
Jun 5, 1995
last permit issued
Jul 17, 1995
completed
74.5K
cumulative oil, bbl
67.1K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 17, 1995
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Burdine Heirs O-10-33930Jack Black (Cisco)RMB Operating LLC274.5K67.1KAug 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1McShane, J. Inc.Aug 1993 → Oct 1995
  2. 2Vista Resources, Inc. (A)Nov 1995 → Feb 2000
  3. 3Prize Operating CompanyMar 2000 → Mar 2002
  4. 4Gruy Petroleum Management Co.Apr 2002 → Aug 2002
  5. 5Permian Resources, Inc.Sep 2002 → Apr 2004
  6. 6Chesapeake Operating, Inc.May 2004 → Aug 2011

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
436215-99ReenterMcShane, J. Inc.May 25, 1995Jun 5, 1995Jun 16, 19959,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-33930————

Formation tops

As filed on W-2/G-1. Subsea from 2,794 ft elevation.Download CSV →

FormationMD ftSubsea
SpraberryUPPER SPRAYBERRY6,928-4,134
SpraberryLOWER SPRAYBERRY7,434-4,640
Dean8,275-5,481
PennsylvanianPENN LIME9,450-6,656

Perforations

Perforated and open-hole intervals.

FromToType
9,4649,536Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7534814.75200 S
7.6253,6199.6251,260 S
4.59,4646.75225 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 19, 1995Aug 1, 1995Yes
00Aug 21, 1995——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31700059, documented in the API reference.