WELL · 42-317-31926 · DISTRICT 10

Knox, T. #1

Plugged

Martin County  · Vertical

Knox, T. #1 (API 42-317-31926) is a plugged well in Martin County, plugged July 29, 2008, last operated by Lavanco Energy, Ltd..

The RRC has issued 2 drilling permits between 1977 and 2008, permitted to 12,142 ft.

Operator of record

Lavanco Energy, Ltd.

San Angelo, TX · P-5 Y, filed Nov 3, 2023 · 49 permits on file · (325) 277-0186

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsnone
Latest permitLavanco Energy, Ltd.Jun 21, 2008
12,142
total depth, ft
2
permits on file
Jun 21, 2008
last permit issued
—
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Jul 29, 2008

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
663739-99ReenterLavanco Energy, Ltd.Jun 4, 2008Jun 21, 2008Jul 24, 200811,500
2427-99DrillWeiner, Ted Oil PropertiesJul 6, 1977Jul 6, 1977—12,142

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31731926, documented in the API reference.