WELL · 42-317-33019 · DISTRICT 8

Kentex A #2

Y

Martin County · Spraberry (Trend Area) field · Producing  · Vertical

Kentex A #2 (API 42-317-33019) is a well in Martin County operated by Black Arrow Operating LLC, completed November 30, 1984 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 28, 1984, permitted to 8,400 ft.

It was permitted by Henry Petroleum Corp. and has since transferred to Black Arrow Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Spraberry, Jo Mill, Dean.

Its lease has reported 45.6K barrels of oil and 5.96K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Black Arrow Operating LLC

Permitted by Henry Petroleum Corp.; the EWA schedule now lists a different operator.

Dennis, TX · P-5 Y, filed Oct 4, 2025 · (432) 349-3846

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBlack Arrow Operating LLC
Production reportsBlack Arrow Operating, LLCthrough Apr 2026
Latest permitHenry Petroleum Corp.Sep 28, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,400
total depth, ft
1
permits on file
Sep 28, 1984
last permit issued
Nov 30, 1984
completed
45.6K
cumulative oil, bbl
5.96K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 30, 1984
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Kentex "A" O-10-29592Spraberry (Trend Area)Black Arrow Operating, LLC145.6K5.96KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 1,166 · prior 12 1,359(-14%)

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Henry Petroleum Corp.Jan 1993 → Mar 2001
  2. 2Henry Petroleum LPApr 2001 → Dec 2008
  3. 3COG Operating LLCJan 2009 → Dec 2010
  4. 4Legacy Reserves Operating LPJan 2011 → Jul 2017
  5. 5Unit Petroleum CompanyAug 2017 → Jan 2018
  6. 6Regions Operating, LLCFeb 2018 → May 2018
  7. 7Lario Oil & Gas CompanyJun 2018 → Nov 2020
  8. 8Watusi Energy LLCDec 2020 → Nov 2021
  9. 9Black Arrow Operating, LLCDec 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
253046-99DrillHenry Petroleum Corp.Oct 3, 1984Sep 28, 1984—8,400

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-29592————

Formation tops

As filed on W-2/G-1. Subsea from 2,505 ft elevation.Download CSV →

FormationMD ftSubsea
SpraberryUPPER SPRABERRY6,634-4,129
SpraberryMIDDLE SPRABERRY6,951-4,446
SpraberryLOWER SPRABERRY7,124-4,619
Jo MillJO-MILL7,448-4,943
Dean7,912-5,407

Perforations

Perforated and open-hole intervals.

FromToType
7,4087,626Perforated
7,8318,106Perforated
—8,106Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37522017.5210 S
8.6253,64511330 S
4.58,2607.875650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 5, 1985Feb 15, 1985—
00Mar 2, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31733019, documented in the API reference.