WELL · 42-317-33201 · DISTRICT 8
Meek #1
Martin County · Spraberry (Trend Area) field · Vertical
Meek #1 (API 42-317-33201) is a plugged well in Martin County, plugged October 11, 1994, last operated by Brazos Petroleum Inc..
The RRC has issued 2 drilling permits between 1985 and 1987, permitted to 12,000 ft.
It was permitted by Primary Fuels, Inc. and has since transferred to Brazos Petroleum Inc. on the wellbore schedule.
Completion filings report 6 formation tops, including Spraberry, Wolfcamp, Strawn, Atoka.
Its lease has reported 584 barrels of oil and 2.14K mcf of gas since January 1993, last reporting in July 2026.
Operator of record
Permitted by Primary Fuels, Inc.; the EWA schedule now lists a different operator.
Graham, TX · P-5 Y, filed Jan 4, 2026
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Brazos Petroleum Inc. |
| Production reports | Samson Resources Companythrough Apr 1994 |
| Latest permit | Primary Fuels, Inc.Oct 30, 1987 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 12,000
- total depth, ft
- 2
- permits on file
- Oct 30, 1987
- last permit issued
- Oct 9, 1987
- completed
- 584
- cumulative oil, bbl
- 2.14K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 9, 1987
- Shut in
- —
- Plugged
- Oct 11, 1994
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Meek O-10-31485 | Spraberry (Trend Area) | Brazos Petroleum, Inc. | 1 | 584 | 2.14K | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Geodyne Operating CompanyJan 1993 → Mar 1993
- 2Samson Resources CompanyApr 1993 → Mar 1994
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 337990-99 | Recompletion | Primary Fuels, Inc. | Oct 27, 1987 | Oct 30, 1987 | — | 11,370 |
| 280153-99 | Drill | Primary Fuels, Inc. | Jul 12, 1985 | Jul 15, 1985 | — | 12,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-31485 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,725 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,425 | 8,586 | Perforated |
| 8,620 | 8,781 | Perforated |
| 10,185 | 10,204 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 315 | 17.5 | 400 S |
| 9.625 | 3,823 | 12.25 | 1,240 S |
| 7 | 9,363 | 8.75 | 300 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 23, 1987 | Oct 28, 1987 | Yes |
| 00 | Nov 18, 1987 | — | — |
| 00 | Jan 16, 1986 | Dec 17, 1985 | Yes |
| 00 | Jan 11, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-317-33201 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-317-33201 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31733201, documented in the API reference.