WELL · 42-317-34149 · DISTRICT 8
Breedlove-Lepus #1
Martin County · Vertical
Breedlove-Lepus #1 (API 42-317-34149) is a permitted well in Martin County filed by Jetta Operating Company, Inc.; no completion report is on file yet.
The RRC has issued 2 drilling permits between 1997 and 2003, permitted to 12,500 ft.
Completion filings report 6 formation tops, including Clfk, Sprby, Wlfcmp, Strawn.
Its lease has reported 27.2K barrels of oil since February 1998, last reporting in July 2026.
Operator of record
Fort Worth, TX · P-5 Y, filed Apr 4, 2026 · 605 permits on file · (817) 312-8504
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | Jetta Operating Company, Inc.through Dec 2012 |
| Latest permit | Jetta Operating Company, Inc.May 15, 2003 |
- 12,500
- total depth, ft
- 2
- permits on file
- May 15, 2003
- last permit issued
- —
- completed
- 27.2K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 1998 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Breedlove-Lepus O-10-35753 | Comanche Bluff (Silurian) | Zarvona Energy LLC | 1 | 27.2K | 0 | Feb 1998 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Santa FE Energy Resources, Inc.Feb 1998 → Oct 1999
- 2Santa FE Snyder CorporationDec 1999 → Oct 2000
- 3Devon SFS Operating, Inc.Nov 2000 → Jan 2002
- 4Jetta Operating Company, Inc.Feb 2002 → Dec 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 531937-99 | Recompletion | Jetta Operating Company, Inc. | May 15, 2003 | May 15, 2003 | — | 12,168 |
| 470997-99 | Drill | Santa FE Energy Resources, Inc. | Dec 8, 1997 | Dec 8, 1997 | Dec 15, 1997 | 12,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-35753 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,897 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Clfk | 6,268 | -3,371 |
| Sprby | 8,003 | -5,106 |
| Wlfcmp | 9,706 | -6,809 |
| Strawn | 10,858 | -7,961 |
| Silurian (undifferentiated)SILURIAN | 12,130 | -9,233 |
| TD | 12,168 | -9,271 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 12,142 | 12,168 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 379 | 17.5 | 400 S |
| 8.625 | 4,514 | 11 | 500 S |
| 5.5 | 12,117 | 7.875 | 750 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 30, 1998 | May 29, 1998 | Yes |
| 00 | Jun 18, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-317-34149 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-317-34149 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/31734149, documented in the API reference.