WELL · 42-317-40176 · DISTRICT 8

Nail Unit 1 #3112AH

Y

Martin County · Spraberry (Trend Area) R 40 Exc field · Shut IN  · Horizontal

Nail Unit 1 #3112AH (API 42-317-40176) is a horizontal well in Martin County operated by Xto Energy Inc., completed November 18, 2025 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued April 10, 2015, permitted to 10,000 ft.

Completion filings report 14 formation tops, including Santa Rosa, Yates, Queen, Grayburg.

Its lease has reported 849K barrels of oil and 1.85M mcf of gas since November 2015, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit.

Operator of record

XTO Energy Inc.

Spring, TX · P-5 Y, filed Feb 4, 2026 · 16,156 permits on file · (832) 625-1100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleXTO Energy Inc.
Production reportsXTO Energy Inc.through Apr 2026
Latest permitXTO Energy Inc.Apr 10, 2015
10,000
total depth, ft
1
permits on file
Apr 10, 2015
last permit issued
Nov 18, 2025
completed
849K
cumulative oil, bbl
1.85M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2015 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 18, 2025
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Nail Unit 1 O-10-47199Spraberry (Trend Area) R 40 ExcXTO Energy Inc.6849K1.85MNov 2015 – Jul 2026

Oil, barrels lease total

Last 12 months 36,382 · prior 12 33,773(+8%)

05K10K15K202420252026

Gas, mcf lease total

Last 12 months 87,836 · prior 12 99,596(-12%)

020K40K60K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1XTO Energy Inc.Nov 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
805328-99DrillXTO Energy Inc.Apr 7, 2015Apr 10, 2015Jun 18, 201510,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-47199————
—— O-10-47199————

Formation tops

As filed on W-2/G-1. Subsea from 2,745 ft elevation.Download CSV →

FormationMD ftSubsea
Santa Rosa3612,384
Yates2,640105
Queen3,485-740
Grayburg4,005-1,260
San AndresSAN ANDRES - ACTIVE CO2 FLOOD; H4,306-1,561
Spraberry7,546-4,801
Dean8,824-6,079
Pennsylvanian9,106-6,361
Wolfcamp9,106-6,361
Cisco——
Fusselman——
Mississippian——
Pennsylvanian——
Silurian (undifferentiated)SILURIAN——
Strawn——

Perforations

Perforated and open-hole intervals.

FromToType
9,59816,501Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,26517.51,141 S
9.6258,59512.25963 S
5.516,6418.51,726 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 16, 2025Dec 1, 2025—
00Nov 14, 2025Feb 27, 2025—
00Oct 26, 2020Oct 20, 2020—
00Jul 15, 2019Apr 18, 2019—
00Feb 25, 2016Dec 29, 2015Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jan 2026
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000119793H-1 InjectionActive5,0004,5059,010–9,246

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120252026

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/31740176, documented in the API reference.