WELL · 42-321-00024 · DISTRICT 3

Northern Ranch #3

N

Matagorda County  · Vertical

Northern Ranch #3 (API 42-321-00024) is a permitted well in Matagorda County filed by Pennzoil Exploration & Prod. CO.; no completion report is on file yet.

The RRC has issued 5 drilling permits between 1978 and 1989, permitted to 8,760 ft.

Completion filings report 9 formation tops, including 6270' Sand, Robertson, Robertson Sand, Carlson.

Its 2 leases have reported 119K barrels of oil and 270K mcf of gas since January 1993, last reporting in July 2026.

Operator of record

Pennzoil Exploration & Prod. Co.

Carthage, TX · P-5 Y, filed Mar 22, 2001 · 1,023 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsTrinidad Resources, LLCthrough Sep 2019
Latest permitPennzoil Exploration & Prod. Co.May 23, 1989
8,760
total depth, ft
5
permits on file
May 23, 1989
last permit issued
—
completed
119K
cumulative oil, bbl
270K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Northern Ranch O-3-20849Northern Ranch (6270)Trinidad Resources, LLC1119K270KJan 1993 – Jul 2026
— G-3-131825——000—

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mueller Engineering Corp.Jan 1993 → Jul 1997
  2. 2Apache CorporationAug 1997 → Jan 2013
  3. 3JMM Energy LLCFeb 2013 → Jun 2015
  4. 4Trinidad Resources, LLCAug 2019 → Sep 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
359504-99RecompletionPennzoil Exploration & Prod. Co.May 19, 1989May 23, 1989—8,760
293587-99RecompletionPennzoil Producing Co.Aug 15, 1985Oct 28, 1985—8,760
283653-99RecompletionPennzoil Producing Co.Aug 28, 1985Aug 29, 1985—8,760
253568-99RecompletionCockrell Oil CorporationSep 28, 1984Oct 1, 1984Oct 12, 19847,494
29988-99RecompletionCockrell Corp.Jul 24, 1978Jul 24, 1978—8,760

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-131825————
—— O-3-20849————

Formation tops

As filed on W-2/G-1. Subsea from 82 ft elevation.Download CSV →

FormationMD ftSubsea
6270' Sand6,270-6,188
Robertson6,649-6,567
Robertson Sand6,649-6,567
Carlson6,720-6,638
Carlson Sand6,720-6,638
Hurd6,970-6,888
Camp B7,195-7,113
Camp B7,200-7,118
Cornelius7,282-7,200
Cornelius Sand7,282-7,200

Perforations

Perforated and open-hole intervals.

FromToType
2,1702,237Perforated
6,2716,280Perforated
6,7246,733Perforated
7,1957,200Perforated
7,1987,203Perforated
7,2827,290Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,42713.75—
9.6251,427——
9.6251,429—750 S
2.8756,567——
5.57,2008.75—
5.57,494—500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 12, 1999Oct 28, 1999—
00Jan 24, 1991Sep 7, 1990—
00Jan 14, 1991——
00Oct 10, 1989Aug 14, 1989Yes
00Sep 21, 1989——
00Jul 15, 1986Jun 26, 1986Yes
00Jul 4, 1986——
00Nov 22, 1985Oct 28, 1985Yes
00Nov 14, 1985——
00Jan 12, 1984Aug 12, 1978—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32100024, documented in the API reference.