WELL · 42-321-30379 · DISTRICT 3

Duran Fannie P. et AL #2

Plugged

Matagorda County · Linnville Bayou (8600-B) field  · Vertical

Duran Fannie P. ET AL #2 (API 42-321-30379) is a plugged well in Matagorda County, plugged June 1, 2004, last operated by Unit Petroleum Company.

The RRC has issued 2 drilling permits between 1990 and 1991, permitted to 10,250 ft.

It was permitted by Hawthorne Oil And Gas Corp. and has since transferred to Unit Petroleum Company on the wellbore schedule.

Completion filings report 4 formation tops, including Anuhauc Top, Anuhuac Top, Miocene (undifferentiated), Frio.

Operator of record

Unit Petroleum Company

Permitted by Hawthorne Oil and Gas Corp.; the EWA schedule now lists a different operator.

Tulsa, OK · P-5 Y, filed Dec 4, 2025 · 1,100 permits on file · (918) 493-7700

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleUnit Petroleum Company
Production reportsnone
Latest permitHawthorne Oil and Gas Corp.May 13, 1991

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,250
total depth, ft
2
permits on file
May 13, 1991
last permit issued
Jun 6, 1975
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2008

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 6, 1975
Shut in
—
Plugged
Jun 1, 2004

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Duran, Fannie P. O-3-21045Linnville Bayou (8400)Spur Operating Co.100Jan 1993 – Mar 2008
Duran, Fannie P., et AL O-3-10977Linnville Bayou (8600-B)Unit Petroleum Company200Jan 1993 – Oct 1995
— G-3-62988——000—
— O-3-20628——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
387890-99RecompletionHawthorne Oil and Gas Corp.May 13, 1991May 13, 1991May 3, 199110,250
368455-99RecompletionHawthorne Oil and Gas Corp.Jan 10, 1990Jan 11, 1990—10,250

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-62988————
—— O-3-10977————
—— O-3-20628————
—— O-3-21045————

Formation tops

As filed on W-2/G-1. Subsea from 51 ft elevation.Download CSV →

FormationMD ftSubsea
Anuhauc Top6,340-6,289
Anuhuac Top6,340-6,289
Miocene (undifferentiated)MIOCENE6,340-6,289
Miocene (undifferentiated)MIOCENE BASE6,340-6,289
Frio7,936-7,885

Perforations

Perforated and open-hole intervals.

FromToType
8,4008,404Perforated
8,4418,447Perforated
8,5318,536Perforated
—8,595Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.752,01714.751,100 S
5.58,7468.75650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 9, 1991May 21, 1991Yes
00Jun 27, 1991Feb 6, 1990Yes
00Mar 8, 1990Feb 6, 1990Yes
00Feb 28, 1990——
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Jan 1995
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000081778W-14 DisposalPlugged Jul 28, 20041,0001,0002,000–2,750

MONTHLY INJECTED, BBL · H-10 · LAST 12 REPORTED MONTHS

Last 12 months 0

011995

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32130379, documented in the API reference.