WELL · 42-321-31695 · DISTRICT 3
LE Tulle Clara #1
Matagorda County · Oyster Lake (Frio 4050) field · Vertical
Le Tulle Clara #1 (API 42-321-31695) is a plugged well in Matagorda County, plugged June 30, 2005, last operated by Progas Properties Inc..
The RRC has issued one drilling permit (amended once), issued March 18, 1994, permitted to 4,110 ft.
It was permitted by Tracer Energy, Inc. and has since transferred to Progas Properties Inc. on the wellbore schedule.
Completion filings report one formation top, including Oyster Lake.
Operator of record
Permitted by Tracer Energy, Inc.; the EWA schedule now lists a different operator.
New Braunfels, TX · P-5 Y, filed Mar 4, 2026 · 2 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Progas Properties Inc. |
| Production reports | Big Lake Corporationthrough Jan 1997 |
| Latest permit | Tracer Energy, Inc.Mar 18, 1994 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 4,110
- total depth, ft
- 2
- permits on file
- Mar 18, 1994
- last permit issued
- Sep 17, 1994
- completed
- 0
- cumulative oil, bbl
- 233K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 1994 THROUGH Jun 2005
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 17, 1994
- Shut in
- —
- Plugged
- Jun 30, 2005
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| LE Tulle, Clara G-3-153351 | Oyster Lake (Frio 4050) | Progas Properties, Inc. | 1 | 0 | 233K | Sep 1994 – Jun 2005 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Plantation Operating Co., Inc.Sep 1994 → Nov 1995
- 2Tracer Energy, Inc.Dec 1995 → Mar 1996
- 3Big Lake CorporationJul 1996 → Jan 1997
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 422193-98 | Drill | Tracer Energy, Inc. | Mar 7, 1996 | Mar 18, 1994 | — | 4,110 |
| 422193-99 | Drill | Plantation Operating Co., Inc. | Mar 18, 1994 | Mar 18, 1994 | Mar 19, 1994 | 4,100 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-153351 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 8 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Oyster Lake | 3,980 | -3,972 |
| Oyster Lake | 4,050 | -4,042 |
| Oyster Lake | 4,052 | -4,044 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,902 | 3,904 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 450 | 10.75 | 151 S |
| 4.5 | 4,103 | 7.875 | 870 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 5, 1995 | Feb 13, 1995 | Yes |
| 00 | Mar 27, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-321-31695 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-321-31695 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32131695, documented in the API reference.