WELL · 42-321-31795 · DISTRICT 3
Huebner #2
Matagorda County · Faith-Mag (Lewis) field · Vertical
Huebner #2 (API 42-321-31795) is a plugged well in Matagorda County, plugged July 20, 2017, last operated by Eog Resources Inc..
The RRC has issued one drilling permit (amended once), issued September 22, 1999, permitted to 10,950 ft.
Completion filings report 2 formation tops, including Base Marine Miocene, Frio.
Operator of record
Midland, TX · P-5 Y, filed Jul 4, 2026 · 16,344 permits on file · (713) 594-5431
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EOG Resources Inc. |
| Production reports | EOG Resources, Inc.through Mar 2012 |
| Latest permit | EOG Resources, Inc.Sep 22, 1999 |
- 10,950
- total depth, ft
- 2
- permits on file
- Sep 22, 1999
- last permit issued
- Nov 3, 1999
- completed
- 0
- cumulative oil, bbl
- 4.49M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Nov 1999 THROUGH Jul 2017
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 3, 1999
- Shut in
- —
- Plugged
- Jul 20, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Huebner G-3-175083 | Faith-Mag (Lewis) | EOG Resources, Inc. | 1 | 0 | 3.3M | Nov 1999 – Jul 2017 |
| Huebner G-3-175135 | Faith-Mag (Frio 9500) | EOG Resources, Inc. | 1 | 0 | 1.19M | Nov 1999 – Jul 2017 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1EOG Resources, Inc.Nov 1999 → Mar 2012
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 487839-98 | Drill | EOG Resources, Inc. | Nov 29, 1999 | Sep 22, 1999 | — | 10,950 |
| 487839-99 | Drill | Enron Oil & Gas Company | Sep 22, 1999 | Sep 22, 1999 | Oct 6, 1999 | 10,950 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-175083 | — | — | — | — |
| — | — G-3-175135 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 28 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Base Marine Miocene | 6,500 | -6,472 |
| FrioTOP FRIO | 8,160 | -8,132 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 9,402 | 9,434 | Perforated |
| 9,402 | 9,654 | Perforated |
| 9,622 | 9,624 | Perforated |
| 9,631 | 9,654 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 2,020 | 12.25 | 670 S |
| 4.5 | 9,907 | 8.75 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 6, 2008 | Nov 26, 2007 | — |
| 00 | Jan 24, 2000 | Dec 8, 1999 | Yes |
| 00 | Dec 23, 1999 | — | — |
| 00 | Dec 21, 1999 | Nov 23, 1999 | Yes |
| 00 | Dec 15, 1999 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-321-31795 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-321-31795 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32131795, documented in the API reference.