WELL · 42-321-31837 · DISTRICT 3
Baer Ranch #1
Matagorda County · Baer Ranch (Tex-Miss #6) field · Vertical
Baer Ranch #1 (API 42-321-31837) is a plugged well in Matagorda County, plugged December 7, 2012, last operated by Coronado Energy E&P Company LLC.
The RRC has issued 3 drilling permits between 2000 and 2007, permitted to 17,000 ft.
It was permitted by Peoples Energy Prod.-TX, L.P. and has since transferred to Coronado Energy E&P Company LLC on the wellbore schedule.
Completion filings report 5 formation tops, including Miocene (undifferentiated), Textulaira Mississippi 3, Tex Miss 3, Tex Miss 6.
Operator of record
Coronado Energy E&P Company LLC
Permitted by Peoples Energy Prod.-TX, L.P.; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Jul 5, 2013 · 103 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Coronado Energy E&P Company LLC |
| Production reports | Coronado Energy E&P Company, LLCthrough Oct 2007 |
| Latest permit | Peoples Energy Prod.-TX, L.P.Mar 2, 2007 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 17,000
- total depth, ft
- 3
- permits on file
- Mar 2, 2007
- last permit issued
- May 15, 2006
- completed
- 0
- cumulative oil, bbl
- 4.6M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2000 THROUGH Jun 2016
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 15, 2006
- Shut in
- —
- Plugged
- Dec 7, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Baer Ranch G-3-228432 | Baer Ranch (Tex-Miss #3) | EP Energy E&P Company, L.P. | 1 | 0 | 45.8K | Mar 2007 – Jun 2016 |
| Baer Ranch G-3-220346 | Baer Ranch (Tex-Miss #6) | Coronado Energy E&P Company, LLC | 1 | 0 | 13.4K | May 2006 – Jan 2008 |
| Baer Ranch G-3-182293 | Baer Ranch (Tex-Miss #3) | Peoples Energy Prod.-TX, L.P. | 1 | 0 | 4.54M | Dec 2000 – Jul 2007 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Whitmar Exploration CompanyJan 2001 → Mar 2003
- 2Peoples Energy Prod.-TX, L.P.Apr 2004 → Aug 2007
- 3Coronado Energy E&P Company, LLCOct 2007 → Oct 2007
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 634234-99 | Recompletion | Peoples Energy Prod.-TX, L.P. | Feb 27, 2007 | Mar 2, 2007 | Mar 8, 2007 | 17,000 |
| 613809-99 | Recompletion | Peoples Energy Prod.-TX, L.P. | Feb 8, 2006 | Feb 8, 2006 | — | 17,000 |
| 497553-99 | Drill | Whitmar Exploration Company | Jul 24, 2000 | Jul 27, 2000 | Aug 8, 2000 | 16,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-182293 | — | — | — | — |
| — | — G-3-220346 | — | — | — | — |
| — | — G-3-228432 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 3 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Miocene (undifferentiated)BASE MIOCENE | 6,635 | -6,632 |
| Textulaira Mississippi 3 | 15,070 | -15,067 |
| Tex Miss 3 | 15,084 | -15,081 |
| Tex Miss 6 | 16,280 | -16,277 |
| Textulaira Mississippi 6 | 16,310 | -16,307 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 15,084 | 15,212 | Perforated |
| 15,096 | 15,109 | Perforated |
| 15,194 | 15,210 | Perforated |
| 16,352 | 16,379 | Perforated |
| 16,420 | 16,452 | Perforated |
| 16,486 | 16,488 | Perforated |
| 16,498 | 16,500 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 16 | 2,515 | 20 | 2,320 S |
| 9.625 | 6,948 | 10.625 | 110 S |
| 11.875 | 7,250 | 14.75 | 600 S |
| 9.625 | 14,900 | 10.625 | 110 S |
| 3.5 | 15,136 | 4.75 | 67 S |
| 4.5 | 16,700 | 6.75 | 180 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 30, 2007 | Jul 9, 2007 | Yes |
| 00 | Jul 26, 2007 | — | — |
| 00 | Feb 22, 2007 | Jul 5, 2006 | Yes |
| 00 | Oct 24, 2006 | — | — |
| 00 | May 2, 2005 | Dec 30, 2004 | — |
| 00 | Jun 26, 2001 | Jan 29, 2001 | Yes |
| 00 | May 14, 2001 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-321-31837 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-321-31837 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32131837, documented in the API reference.