WELL · 42-321-31935 · DISTRICT 3

Terry-Poessel Gas Unit #1

Plugged

Matagorda County · Tidehaven (10 300) field  · Directional

Terry-Poessel Gas Unit #1 (API 42-321-31935) is a plugged well in Matagorda County, plugged March 15, 2019, last operated by Santos USA Corp..

The RRC has issued 3 drilling permits (amended twice) between 2002 and 2005, permitted to 13,000 ft.

Completion filings report 2 formation tops, including F-16, F-19.

Operator of record

Santos USA Corp.

Houston, TX · P-5 Y, filed Sep 3, 2010 · 67 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSantos USA Corp.
Production reportsArcadia Operating, LLCthrough Jul 2018
Latest permitSantos USA Corp.Apr 6, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

13,000
total depth, ft
5
permits on file
Apr 6, 2005
last permit issued
Oct 18, 2002
completed
0
cumulative oil, bbl
2.91M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2002 THROUGH Mar 2019

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 18, 2002
Shut in
—
Plugged
Mar 15, 2019

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Terry-Poessel Gas Unit G-3-208298Tidehaven (Frio, Upper)Arcadia Operating, LLC1090.4KSep 2004 – Mar 2019
Terry-Poessel Gas Unit G-3-208843Tidehaven ( 9,500 Frio)Arcadia Operating, LLC102.32MFeb 2005 – Mar 2019
Terry-Poessel Gas Unit G-3-195488Tidehaven (10,300)Santos USA Corp.10496KOct 2002 – Apr 2005

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Esenjay Exploration, IncOct 2002 → Dec 2003
  2. 2Santos USA Corp.Jan 2004 → Sep 2007
  3. 3Ipr USA Corp.Oct 2007 → Mar 2008
  4. 4Wynn-Crosby Operating, Ltd.Apr 2008 → Dec 2012
  5. 5Arcadia Operating, LLCJan 2013 → Jul 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
559410-99RecompletionSantos USA Corp.Mar 23, 2005Apr 6, 2005—10,300
559268-99RecompletionSantos USA Corp.Mar 21, 2005Mar 23, 2005—13,000
522965-97DrillEsenjay Exploration, IncMar 18, 2003Aug 21, 2002—13,000
522965-98DrillEsenjay Exploration, IncAug 30, 2002Aug 21, 2002—13,000
522965-99DrillSantos USA Corp.Aug 21, 2002Aug 21, 2002Aug 21, 200213,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-195488————
—— G-3-208298————
—— G-3-208843————

Formation tops

As filed on W-2/G-1. Subsea from 31 ft elevation.Download CSV →

FormationMD ftSubsea
F-168,302-8,271
F-198,513-8,482

Perforations

Perforated and open-hole intervals.

FromToType
8,4188,425Perforated
8,4338,435Perforated
8,4868,527Perforated
9,5849,586Perforated
9,5989,600Perforated
9,6159,617Perforated
10,54310,571Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
164016.5250 S
10.751,80014.751,005 S
10.751,80013.6251,065 S
7.62510,0409.875405 S
7.62510,0478.875405 S
7.62510,0479.09405 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 17, 2018Apr 17, 2018—
00Oct 3, 2005May 13, 2005Yes
00Sep 9, 2005May 13, 2005Yes
00Jun 23, 2005——
00May 20, 2005——
00Jul 28, 2003Mar 14, 2003Yes
00Jul 18, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32131935, documented in the API reference.