WELL · 42-321-32020 · DISTRICT 3

Milberger #1

Plugged

Matagorda County · Hamman East (11 200 Frio) field  · Vertical

Milberger #1 (API 42-321-32020) is a plugged well in Matagorda County, plugged November 3, 2025, last operated by Rap Operating L.L.C..

The RRC has issued 2 drilling permits (amended once) between 2004 and 2005, permitted to 11,500 ft.

It was permitted by South Bay Resources, L.L.C. and has since transferred to Rap Operating L.L.C. on the wellbore schedule.

Completion filings report one formation top, including Frio.

Operator of record

Rap Operating L.L.C.

Permitted by South Bay Resources, L.L.C.; the EWA schedule now lists a different operator.

Jena, LA · P-5 Y, filed Apr 4, 2026 · 2 permits on file · (318) 452-4411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleRap Operating L.L.C.
Production reportsRap Operating, L.L.C.through Jan 2023
Latest permitSouth Bay Resources, L.L.C.Jun 7, 2005

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,500
total depth, ft
3
permits on file
Jun 7, 2005
last permit issued
Oct 26, 2004
completed
0
cumulative oil, bbl
2.16M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2004 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 26, 2004
Shut in
—
Plugged
Nov 3, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Milberger Gas Unit G-3-210822Hamman, East (10,870)Rap Operating, L.L.C.101.92MJun 2005 – Jul 2026
Milberger G-3-209426Hamman, East (11,200 Frio)Rap Operating, L.L.C.10239KOct 2004 – Oct 2025

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1South Bay Resources, L.L.C.Dec 2004 → Sep 2015
  2. 2Rap Operating, L.L.C.Oct 2015 → Jan 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
601609-99RecompletionSouth Bay Resources, L.L.C.Jun 3, 2005Jun 7, 2005—11,500
550165-98DrillSouth Bay Resources, L.L.C.Dec 20, 2004Aug 26, 2004—11,500
550165-99DrillSouth Bay Resources, L.L.C.Aug 26, 2004Aug 26, 2004Sep 9, 200411,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-3-209426————
—— G-3-210822————

Formation tops

As filed on W-2/G-1. Subsea from 52 ft elevation.Download CSV →

FormationMD ftSubsea
Frio10,870-10,818

Perforations

Perforated and open-hole intervals.

FromToType
10,83510,851Perforated
10,83510,864Perforated
11,10611,114Perforated
11,10611,172Perforated
11,12211,127Perforated
11,13211,140Perforated
11,14411,158Perforated
11,172—Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6253,38012.251,174 S
9.6253,44012.251,174 S
4.511,3718.75880 S
4.511,4008.75880 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 15, 2018Mar 4, 2016—
00Dec 6, 2005Nov 28, 2005—
00Dec 5, 2005Aug 8, 2005Yes
00Sep 21, 2005—Yes
00Sep 20, 2005Jan 11, 2005Yes
00Jul 18, 2005—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.