WELL · 42-321-32157 · DISTRICT 3
Linnville #1
Matagorda County · Sugar Valley S. (Frio 10 900) field · Vertical
Linnville #1 (API 42-321-32157) is a plugged well in Matagorda County, plugged August 17, 2012, last operated by Texakoma Operating L.P..
The RRC has issued 2 drilling permits (amended twice) between 2006 and 2008, permitted to 11,500 ft.
Completion filings report 3 formation tops, including Frio, Taylor, Cib 10.
Operator of record
Plano, TX · P-5 Y, filed Jun 4, 2025 · 68 permits on file · (214) 205-8393
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texakoma Operating L.P. |
| Production reports | Texakoma Operating, L.P.through Apr 2010 |
| Latest permit | Texakoma Operating, L.P.Mar 14, 2008 |
- 11,500
- total depth, ft
- 4
- permits on file
- Mar 14, 2008
- last permit issued
- Jul 14, 2007
- completed
- 0
- cumulative oil, bbl
- 106K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2007 THROUGH Aug 2012
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 14, 2007
- Shut in
- —
- Plugged
- Aug 17, 2012
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Linnville G-3-235466 | Sugar Valley (Frio 9,000) | Texakoma Operating, L.P. | 1 | 0 | 99.4K | Apr 2008 – Aug 2012 |
| Linnville G-3-233019 | Sugar Valley, S. (Frio 10,900) | Texakoma Operating, L.P. | 1 | 0 | 6.77K | Jul 2007 – Jun 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texakoma Operating, L.P.Oct 2007 → Apr 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 656773-98 | Recompletion | Texakoma Operating, L.P. | Apr 24, 2008 | Mar 14, 2008 | Mar 31, 2008 | 11,500 |
| 656773-99 | Recompletion | Texakoma Operating, L.P. | Mar 5, 2008 | Mar 14, 2008 | — | 11,500 |
| 629966-98 | Drill | Texakoma Operating, L.P. | Aug 2, 2007 | Dec 5, 2006 | Apr 20, 2007 | 11,500 |
| 629966-99 | Drill | Texakoma Operating, L.P. | Dec 4, 2006 | Dec 5, 2006 | Apr 20, 2007 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-233019 | — | — | — | — |
| — | — G-3-235466 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 38 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 8,704 | 8,710 | Perforated |
| 10,886 | 10,922 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,088 | 14.75 | 1,440 S |
| 7.625 | 9,867 | 9.875 | 1,105 S |
| 4.5 | 11,114 | 6.75 | 240 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 17, 2008 | Apr 28, 2008 | Yes |
| 00 | May 30, 2008 | — | — |
| 00 | May 27, 2008 | Aug 20, 2007 | Yes |
| 00 | Feb 13, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-321-32157 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-321-32157 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32132157, documented in the API reference.