WELL · 42-321-32317 · DISTRICT 3
Trull #2
Matagorda County · Pheasant South (10 600) field · Temp Abandoned · Vertical
Trull #2 (API 42-321-32317) is a well in Matagorda County operated by North Lake Resources LLC, completed March 31, 2011 and listed as temp abandoned on the RRC schedule.
The RRC has issued one drilling permit, issued November 9, 2010, permitted to 11,200 ft.
It was permitted by Hollimon Oil Corporation and has since transferred to North Lake Resources LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Frio, Melbourne, Mcdonald.
No lease production has been reported under this well’s leases.
Operator of record
Permitted by Hollimon Oil Corporation; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Mar 4, 2026 · (405) 934-1010
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | North Lake Resources LLC |
| Production reports | Hollimon Oil Corporationthrough Sep 2016 |
| Latest permit | Hollimon Oil CorporationNov 9, 2010 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,200
- total depth, ft
- 1
- permits on file
- Nov 9, 2010
- last permit issued
- Mar 31, 2011
- completed
- 0
- cumulative oil, bbl
- 839K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 31, 2011
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: R
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Trull G-3-263510 | Pheasant, South (10,600) | North Lake Resources LLC | 1 | 0 | 839K | Mar 2011 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Hollimon Oil CorporationMar 2011 → Sep 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 704868-99 | Drill | Hollimon Oil Corporation | Nov 5, 2010 | Nov 9, 2010 | Jan 10, 2011 | 11,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-3-263510 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 27 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Frio | 7,450 | -7,423 |
| Melbourne | 8,130 | -8,103 |
| McDonald | 9,310 | -9,283 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,759 | 10,776 | Perforated |
| 10,785 | 10,790 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 2,505 | 14.75 | 1,168 S |
| 7.625 | 9,600 | 9.875 | 375 S |
| 4.5 | 11,205 | 6.75 | 245 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 25, 2012 | Apr 18, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-321-32317 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-321-32317 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32132317, documented in the API reference.