WELL · 42-323-00613 · DISTRICT 1

Cage R.C.-28- #1

Plugged

Maverick County · EL Indio N.(san Miguel) field  · Vertical

Cage R.C.-28- #1 (API 42-323-00613) is a plugged well in Maverick County, plugged September 16, 1991, last operated by M-Tex Inc..

The RRC has issued one drilling permit, issued July 18, 2006, permitted to 2,500 ft.

It was permitted by Exploration Company, The and has since transferred to M-Tex Inc. on the wellbore schedule.

Operator of record

M-Tex Inc.

Permitted by Exploration Company, The; the EWA schedule now lists a different operator.

Stockdale, TX · P-5 Y, filed Apr 4, 2026 · 5 permits on file

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleM-Tex Inc.
Production reportsnone
Latest permitExploration Company, TheJul 18, 2006

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

2,500
total depth, ft
1
permits on file
Jul 18, 2006
last permit issued
Jun 12, 1973
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Oct 2006 THROUGH Oct 2010

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 12, 1973
Shut in
—
Plugged
Sep 16, 1991

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cage, R.C.-28- O-1-14777EL Indio, N.(olmos)Newfield Exploration Company100Oct 2006 – Oct 2010
— O-1-4455——000—

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
622687-99ReenterExploration Company, TheJul 17, 2006Jul 18, 2006Jul 21, 20062,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-4455————
—— O-1-14777————

Perforations

Perforated and open-hole intervals.

FromToType
1,1951,210Perforated
1,3141,330Perforated
1,3521,370Perforated
1,3921,402Perforated
1,4061,416Perforated
2,2242,246Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62518812.25—
10.7526312.2585 S
5.52,3139.625412 S
5.52,3289.625—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 3, 2007Oct 13, 2006—
00Feb 22, 2007——
00Jan 12, 1984Nov 30, 1973—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

170K
bbl, last 12 reported months
900K
bbl, all reported
Mar 2010
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000096555H-1 InjectionPlugged Oct 1, 201010,0005981,195–1,880

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 170,470 · prior 12 224,237(-24%)

020K40K20092010

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32300613, documented in the API reference.