WELL · 42-323-00613 · DISTRICT 1
Cage R.C.-28- #1
Maverick County · EL Indio N.(san Miguel) field · Vertical
Cage R.C.-28- #1 (API 42-323-00613) is a plugged well in Maverick County, plugged September 16, 1991, last operated by M-Tex Inc..
The RRC has issued one drilling permit, issued July 18, 2006, permitted to 2,500 ft.
It was permitted by Exploration Company, The and has since transferred to M-Tex Inc. on the wellbore schedule.
Operator of record
Permitted by Exploration Company, The; the EWA schedule now lists a different operator.
Stockdale, TX · P-5 Y, filed Apr 4, 2026 · 5 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | M-Tex Inc. |
| Production reports | none |
| Latest permit | Exploration Company, TheJul 18, 2006 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 2,500
- total depth, ft
- 1
- permits on file
- Jul 18, 2006
- last permit issued
- Jun 12, 1973
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Oct 2006 THROUGH Oct 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jun 12, 1973
- Shut in
- —
- Plugged
- Sep 16, 1991
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cage, R.C.-28- O-1-14777 | EL Indio, N.(olmos) | Newfield Exploration Company | 1 | 0 | 0 | Oct 2006 – Oct 2010 |
| — O-1-4455 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 622687-99 | Reenter | Exploration Company, The | Jul 17, 2006 | Jul 18, 2006 | Jul 21, 2006 | 2,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-4455 | — | — | — | — |
| — | — O-1-14777 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,195 | 1,210 | Perforated |
| 1,314 | 1,330 | Perforated |
| 1,352 | 1,370 | Perforated |
| 1,392 | 1,402 | Perforated |
| 1,406 | 1,416 | Perforated |
| 2,224 | 2,246 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 188 | 12.25 | — |
| 10.75 | 263 | 12.25 | 85 S |
| 5.5 | 2,313 | 9.625 | 412 S |
| 5.5 | 2,328 | 9.625 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 3, 2007 | Oct 13, 2006 | — |
| 00 | Feb 22, 2007 | — | — |
| 00 | Jan 12, 1984 | Nov 30, 1973 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-323-00613 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-323-00613 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 170K
- bbl, last 12 reported months
- 900K
- bbl, all reported
- Mar 2010
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000096555 | H-1 Injection | Plugged Oct 1, 2010 | 10,000 | 598 | 1,195–1,880 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 170,470 · prior 12 224,237(-24%)
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32300613, documented in the API reference.