WELL · 42-323-32195 · DISTRICT 1

Rambie #T20T

Plugged

Maverick County · Saner Ranch (San Miguel) field  · Vertical

Rambie #T20T (API 42-323-32195) is a plugged well in Maverick County, plugged March 2, 2011, last operated by Spartan Operating Company Inc..

The RRC has issued one drilling permit, issued October 7, 1983, permitted to 1,848 ft.

It was permitted by Texas Tar Sands, Ltd. and has since transferred to Spartan Operating Company Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Wilcox, Escondido, Olmos, San Miguel.

Operator of record

Spartan Operating Company Inc.

Permitted by Texas Tar Sands, Ltd.; the EWA schedule now lists a different operator.

Tyler, TX · P-5 Y, filed Apr 6, 2018 · 47 permits on file · (903) 539-6324

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSpartan Operating Company Inc.
Production reportsnone
Latest permitTexas Tar Sands, Ltd.Oct 7, 1983

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,848
total depth, ft
1
permits on file
Oct 7, 1983
last permit issued
Oct 25, 1983
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Mar 2011

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 25, 1983
Shut in
—
Plugged
Mar 2, 2011

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rambie G-1-110742Saner Ranch (San Miguel)Spartan Operating Company, Inc.100Jan 1993 – Mar 2011

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
224674-99DrillTexas Tar Sands, Ltd.Oct 7, 1983Oct 7, 1983—1,848

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-110742————

Formation tops

As filed on W-2/G-1. Subsea from 734 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox330404
EscondidoUPPER ESCONDIDO900-166
EscondidoLOWER ESCONDIDO1,200-466
Olmos1,525-791
San MiguelSAN MIGUEL -41,770-1,036

Perforations

Perforated and open-hole intervals.

FromToType
1,7681,774Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
74011.7515 S
3.51,8056.75—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 14, 1984Dec 7, 1983—
00Jun 7, 1984Dec 7, 1983—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32332195, documented in the API reference.