WELL · 42-323-32202 · DISTRICT 1
Rambie Robert #T22T
Maverick County · Saner Ranch (San Miguel) field · Vertical
Rambie Robert #T22T (API 42-323-32202) is a plugged well in Maverick County, plugged February 26, 2013, last operated by Spartan Operating Company Inc..
The RRC has issued one drilling permit, issued April 23, 1984, permitted to 1,800 ft.
It was permitted by Texas Tar Sands, Ltd. and has since transferred to Spartan Operating Company Inc. on the wellbore schedule.
Completion filings report 4 formation tops, including Wilcox, Escondido, Olmos, San Miguel.
Operator of record
Spartan Operating Company Inc.
Permitted by Texas Tar Sands, Ltd.; the EWA schedule now lists a different operator.
Tyler, TX · P-5 Y, filed Apr 6, 2018 · 47 permits on file · (903) 539-6324
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Spartan Operating Company Inc. |
| Production reports | Wilbanks, Bruce A. Companythrough Aug 1998 |
| Latest permit | Texas Tar Sands, Ltd.Apr 23, 1984 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,800
- total depth, ft
- 1
- permits on file
- Apr 23, 1984
- last permit issued
- Sep 15, 1997
- completed
- 0
- cumulative oil, bbl
- 82.1K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2013
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Sep 15, 1997
- Shut in
- —
- Plugged
- Feb 26, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Rambie, Robert G-1-111168 | Saner Ranch (San Miguel) | Spartan Operating Company, Inc. | 1 | 0 | 82.1K | Jan 1993 – Feb 2013 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Wilbanks, Bruce A. CompanyOct 1997 → Aug 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 236326-99 | Drill | Texas Tar Sands, Ltd. | Apr 11, 1984 | Apr 23, 1984 | — | 1,800 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-111168 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 726 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wilcox | 330 | 396 |
| EscondidoUPPER ESCONDIDO | 900 | -174 |
| EscondidoLOWER ESCONDIDO | 1,200 | -474 |
| Olmos | 1,525 | -799 |
| San Miguel | 1,770 | -1,044 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 1,740 | 1,748 | Perforated |
| 1,766 | 1,770 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 41 | 12.25 | — |
| 4.5 | 1,821 | 7.875 | 500 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 12, 1998 | Apr 24, 1998 | — |
| 00 | Jul 11, 1984 | Jun 15, 1984 | — |
| 00 | Jul 4, 1984 | Jun 15, 1984 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-323-32202 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-323-32202 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32332202, documented in the API reference.