WELL · 42-323-32878 · DISTRICT 1

Cage Ranch #445D

Plugged

Maverick County · Comanche-Halsell (6500) field  · Directional

Cage Ranch #445D (API 42-323-32878) is a plugged well in Maverick County, plugged October 29, 2014, last operated by El Toro Resources LLC.

The RRC has issued 2 drilling permits between 2006 and 2007, permitted to 7,600 ft.

It was permitted by Exploration Company, The and has since transferred to El Toro Resources LLC on the wellbore schedule.

Completion filings report 7 formation tops, including San Miguel, San Muguel, Austin Chalk, Eagle Ford.

Its 2 leases have reported 1.97M barrels of oil since August 2005, last reporting in July 2026. The leases carry 37 wells, so these are lease totals, not this well alone.

Operator of record

EL Toro Resources LLC

Permitted by Exploration Company, The; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Nov 4, 2025 · 114 permits on file · (432) 238-0069

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEL Toro Resources LLC
Production reportsEL Toro Resources LLCthrough Apr 2026
Latest permitExploration Company, TheJan 26, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,600
total depth, ft
2
permits on file
Jan 26, 2007
last permit issued
Nov 13, 2006
completed
1.97M
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 13, 2006
Shut in
—
Plugged
Oct 29, 2014

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 37 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cage Ranch O-1-15139Comanche-Halsell (6500)EL Toro Resources LLC15886K0Mar 2010 – Jul 2026
Cage Ranch O-1-14617Comanche-Halsell (6500)Txco Resources Inc.221.08M0Aug 2005 – Jan 2011

Oil, barrels lease total

Last 12 months 10,663 · prior 12 10,870(-2%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exploration Company, TheSep 2005 → Jun 2007
  2. 2Txco Resources Inc.Jul 2007 → Feb 2010
  3. 3Newfield Exploration CompanyMar 2010 → May 2015
  4. 4EL Toro Resources LLCJun 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
632438-99RecompletionExploration Company, TheJan 24, 2007Jan 26, 2007Oct 31, 20066,800
617653-99DrillExploration Company, TheApr 14, 2006Apr 17, 2006Apr 18, 20067,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-14617————
—— O-1-15139————

Formation tops

As filed on W-2/G-1. Subsea from 791 ft elevation.Download CSV →

FormationMD ftSubsea
San Miguel2,225-1,434
San Muguel2,225-1,434
Austin Chalk3,382-2,591
Eagle FordEAGLEFORD4,155-3,364
Buda4,727-3,936
Del Rio4,882-4,091
Georgetown5,085-4,294

Perforations

Perforated and open-hole intervals.

FromToType
6,3706,561Perforated
6,3706,806Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62522712.25200 S
5.56,3707.875440 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 26, 2010Feb 1, 2007—
00Mar 18, 2008Feb 1, 2007—
00Jan 9, 2007Jul 11, 2006Yes
00Aug 11, 2006——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.