WELL · 42-323-32929 · DISTRICT 1
Cage Ranch #135H
Maverick County · Comanche-Halsell (6500) field · Horizontal
Cage Ranch #135H (API 42-323-32929) is a plugged horizontal well in Maverick County, plugged May 2, 2014, last operated by El Toro Resources LLC.
The RRC has issued 4 drilling permits (amended twice) between 2006 and 2008, permitted to 8,000 ft.
It was permitted by Txco Resources Inc. and has since transferred to El Toro Resources LLC on the wellbore schedule.
Completion filings report 6 formation tops, including Buda, Del Rio, Georgetown, McKnight.
Its 4 leases have reported 1.97M barrels of oil and 70.8K mcf of gas since August 2005, last reporting in July 2026. The leases carry 39 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Txco Resources Inc.; the EWA schedule now lists a different operator.
Oklahoma City, OK · P-5 Y, filed Nov 4, 2025 · 114 permits on file · (432) 238-0069
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | EL Toro Resources LLC |
| Production reports | EL Toro Resources LLCthrough Apr 2026 |
| Latest permit | Txco Resources Inc.Apr 28, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,000
- total depth, ft
- 6
- permits on file
- Apr 28, 2008
- last permit issued
- May 7, 2007
- completed
- 1.97M
- cumulative oil, bbl
- 70.8K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2005 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 7, 2007
- Shut in
- —
- Plugged
- May 2, 2014
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 4 leases this well is completed on; they carry 39 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cage Ranch O-1-15139 | Comanche-Halsell (6500) | EL Toro Resources LLC | 15 | 886K | 0 | Mar 2010 – Jul 2026 |
| Cage-West a 135H Unit G-1-266080 | Cage Ranch (Eagleford) | Newfield Exploration Company | 1 | 0 | 41.1K | Feb 2011 – May 2014 |
| Cage-West a 135H Unit O-1-15082 | Cage Ranch (Eagleford) | Newfield Exploration Company | 1 | 3.8K | 29.8K | Mar 2008 – Apr 2013 |
| Cage Ranch O-1-14617 | Comanche-Halsell (6500) | Txco Resources Inc. | 22 | 1.08M | 0 | Aug 2005 – Jan 2011 |
Oil, barrels lease total
Last 12 months 10,663 · prior 12 10,870(-2%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Exploration Company, TheSep 2005 → Jun 2007
- 2Txco Resources Inc.Jul 2007 → Feb 2010
- 3Newfield Exploration CompanyMar 2010 → May 2015
- 4EL Toro Resources LLCJun 2015 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 653785-98 | Recompletion | Txco Resources Inc. | Apr 10, 2008 | Apr 28, 2008 | Dec 20, 2007 | 5,000 |
| 653785-99 | Recompletion | Txco Resources Inc. | Jan 23, 2008 | Feb 4, 2008 | — | 5,000 |
| 641818-99 | Recompletion | Txco Resources Inc. | Jul 3, 2007 | Jul 16, 2007 | Jun 9, 2007 | 7,000 |
| 638968-99 | Recompletion | Txco Resources Inc. | May 14, 2007 | Jul 2, 2007 | Apr 10, 2007 | 7,000 |
| 627878-98 | Drill | Exploration Company, The | Mar 19, 2007 | Oct 27, 2006 | Oct 28, 2006 | 6,800 |
| 627878-99 | Drill | Exploration Company, The | Oct 20, 2006 | Oct 27, 2006 | — | 8,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-1-266080 | — | — | — | — |
| — | — O-1-14617 | — | — | — | — |
| — | — O-1-15082 | — | — | — | — |
| — | — O-1-15139 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 794 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,274 | 6,929 | Perforated |
| 6,255 | 6,734 | Perforated |
| 6,255 | 7,394 | Perforated |
| 6,255 | 9,134 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 212 | 12.25 | 200 S |
| 5.5 | 6,255 | 7.875 | 400 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 26, 2013 | Jan 25, 2012 | — |
| 00 | Feb 26, 2010 | Jul 3, 2007 | — |
| 00 | Dec 30, 2009 | Sep 12, 2008 | Yes |
| 00 | Nov 6, 2009 | — | — |
| 00 | Apr 15, 2008 | Jul 3, 2007 | — |
| 00 | Apr 2, 2008 | Jul 19, 2007 | — |
| 00 | Jun 28, 2007 | Apr 17, 2007 | Yes |
| 00 | Jun 12, 2007 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-323-32929 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-323-32929 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32332929, documented in the API reference.