WELL · 42-323-32962 · DISTRICT 1

Cage Ranch #141H

Plugged

Maverick County · Comanche-Halsell (6500) field  · Horizontal

Cage Ranch #141H (API 42-323-32962) is a plugged horizontal well in Maverick County, plugged December 8, 2023, last operated by El Toro Resources LLC.

The RRC has issued one drilling permit (amended once), issued June 22, 2007, permitted to 7,500 ft.

It was permitted by Txco Resources Inc. and has since transferred to El Toro Resources LLC on the wellbore schedule.

Completion filings report 6 formation tops, including Buda, Del Rio, Georgetown, McKnight.

Its 2 leases have reported 1.97M barrels of oil since August 2005, last reporting in July 2026. The leases carry 37 wells, so these are lease totals, not this well alone.

Operator of record

EL Toro Resources LLC

Permitted by Txco Resources Inc.; the EWA schedule now lists a different operator.

Oklahoma City, OK · P-5 Y, filed Nov 4, 2025 · 114 permits on file · (432) 238-0069

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleEL Toro Resources LLC
Production reportsEL Toro Resources LLCthrough Apr 2026
Latest permitTxco Resources Inc.Jun 22, 2007

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,500
total depth, ft
2
permits on file
Jun 22, 2007
last permit issued
Aug 29, 2007
completed
1.97M
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2005 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 29, 2007
Shut in
—
Plugged
Dec 8, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 37 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Cage Ranch O-1-15139Comanche-Halsell (6500)EL Toro Resources LLC15886K0Mar 2010 – Jul 2026
Cage Ranch O-1-14617Comanche-Halsell (6500)Txco Resources Inc.221.08M0Aug 2005 – Jan 2011

Oil, barrels lease total

Last 12 months 10,663 · prior 12 10,870(-2%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Exploration Company, TheSep 2005 → Jun 2007
  2. 2Txco Resources Inc.Jul 2007 → Feb 2010
  3. 3Newfield Exploration CompanyMar 2010 → May 2015
  4. 4EL Toro Resources LLCJun 2015 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
640586-98DrillTxco Resources Inc.Sep 4, 2007Jun 22, 2007Aug 5, 20077,500
640586-99DrillExploration Company, TheJun 12, 2007Jun 22, 2007Aug 5, 20077,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-1-14617————
—— O-1-15139————

Formation tops

As filed on W-2/G-1. Subsea from 859 ft elevation.Download CSV →

FormationMD ftSubsea
Buda4,865-4,006
Del Rio5,015-4,156
Georgetown5,210-4,351
McKnight5,785-4,926
Edwards6,105-5,246
Glen Rose6,360-5,501

Perforations

Perforated and open-hole intervals.

FromToType
6,3707,816Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62523912.25200 S
5.56,3708.625380 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 26, 2010Sep 19, 2007Yes
00Jun 5, 2008Sep 19, 2007Yes
00May 6, 2008——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32332962, documented in the API reference.