WELL · 42-323-32966 · DISTRICT 1
Cage-West B #153H
Maverick County · Comanche-Halsell (6500) field · Horizontal
Cage-West B #153H (API 42-323-32966) is a plugged horizontal well in Maverick County, plugged September 15, 2010, last operated by Txco Resources Inc..
The RRC has issued 2 drilling permits (amended once) in 2007, permitted to 7,200 ft.
Completion filings report 6 formation tops, including Buda, Del Rio, Georgetown, McKnight.
Its 2 leases have reported 13.2K barrels of oil since September 2007, last reporting in November 2010. The leases carry 3 wells, so these are lease totals, not this well alone.
Operator of record
San Antonio, TX · P-5 Y, filed Sep 3, 2010 · 201 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Txco Resources Inc. |
| Production reports | Txco Resources Inc.through Feb 2010 |
| Latest permit | Txco Resources Inc.Nov 15, 2007 |
- 7,200
- total depth, ft
- 3
- permits on file
- Nov 15, 2007
- last permit issued
- Oct 15, 2007
- completed
- 13.2K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2007 THROUGH Nov 2010
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 15, 2007
- Shut in
- —
- Plugged
- Sep 15, 2010
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cage-West B O-1-14913 | Comanche-Halsell (6500) | Txco Resources Inc. | 2 | 13.2K | 0 | Oct 2007 – Nov 2010 |
| Cage-West B 153H Unit O-1-14906 | Comanche-Halsell (6500) | Txco Resources Inc. | 1 | 0 | 0 | Sep 2007 – Apr 2008 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Txco Resources Inc.Dec 2008 → Feb 2010
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 649240-99 | Recompletion | Txco Resources Inc. | Nov 8, 2007 | Nov 15, 2007 | Oct 2, 2007 | 6,700 |
| 641764-98 | Drill | Txco Resources Inc. | Aug 31, 2007 | Jul 16, 2007 | Aug 3, 2007 | 7,000 |
| 641764-99 | Drill | Txco Resources Inc. | Jul 2, 2007 | Jul 16, 2007 | Aug 3, 2007 | 7,200 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-14906 | — | — | — | — |
| — | — O-1-14913 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 721 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,200 | 7,873 | Perforated |
| 6,200 | 8,898 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 275 | 12.25 | 200 S |
| 5.5 | 6,200 | 7.875 | 420 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 6, 2009 | Nov 14, 2007 | Yes |
| 00 | May 15, 2008 | Sep 19, 2007 | Yes |
| 00 | Apr 10, 2008 | — | — |
| 00 | Mar 25, 2008 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-323-32966 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-323-32966 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32332966, documented in the API reference.