WELL · 42-323-33222 · DISTRICT 1
Cinco Ranch #104H
Maverick County · Comanche-Halsell (6500) field · Horizontal
Cinco Ranch #104H (API 42-323-33222) is a plugged horizontal well in Maverick County, plugged July 19, 2022, last operated by Saxet Petroleum Inc..
The RRC has issued one drilling permit (amended once), issued October 14, 2008, permitted to 9,000 ft.
It was permitted by Red Arrow Energy, LLC and has since transferred to Saxet Petroleum Inc. on the wellbore schedule.
Completion filings report 6 formation tops, including Buda, Del Rio, Georgetown, McKnight.
Its lease has reported 18.2K barrels of oil since December 2008, last reporting in July 2026.
Operator of record
Permitted by Red Arrow Energy, LLC; the EWA schedule now lists a different operator.
Houston, TX · P-5 Y, filed Jan 14, 2023 · 5 permits on file · (713) 816-8224
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Saxet Petroleum Inc. |
| Production reports | Saxet Petroleum, Inc.through Mar 2026 |
| Latest permit | Red Arrow Energy, LLCOct 14, 2008 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,000
- total depth, ft
- 2
- permits on file
- Oct 14, 2008
- last permit issued
- Dec 18, 2008
- completed
- 18.2K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Dec 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Dec 18, 2008
- Shut in
- —
- Plugged
- Jul 19, 2022
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Cinco Ranch O-1-15036 | Comanche-Halsell (6500) | Saxet Petroleum, Inc. | 1 | 18.2K | 0 | Dec 2008 – Jul 2026 |
Oil, barrels lease total
Last 12 months 683 · prior 12 985(-31%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Red Arrow Energy, LLCDec 2008 → Sep 2012
- 2CMR Energy, L.P.Oct 2012 → Nov 2014
- 3Saxet Petroleum, Inc.Apr 2017 → Mar 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 672739-98 | Drill | Red Arrow Energy, LLC | Oct 31, 2008 | Oct 14, 2008 | Nov 8, 2008 | 9,000 |
| 672739-99 | Drill | Red Arrow Energy, LLC | Oct 8, 2008 | Oct 14, 2008 | Nov 8, 2008 | 9,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-15036 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 788 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,780 | 7,076 | Perforated |
| 6,972 | 7,076 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 588 | 11 | 211 S |
| 5.5 | 5,780 | 7.875 | 375 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jun 16, 2009 | Jan 15, 2009 | Yes |
| 00 | May 29, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-323-33222 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-323-33222 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32333222, documented in the API reference.