WELL · 42-323-33360 · DISTRICT 1

Tovar West-Lloyd 75 a Unit #1H

N

Maverick County · Briscoe Ranch (Eagleford) field  · Horizontal

Tovar West-Lloyd 75 A Unit #1H (API 42-323-33360) is a horizontal well in Maverick County operated by Anadarko E&P Company LP, completed November 20, 2010.

The RRC has issued one drilling permit, issued July 22, 2010, permitted to 6,500 ft.

Completion filings report 3 formation tops, including San Miguel, Pecan Gap, Eagle Ford.

No lease production has been reported under this well’s leases.

Operator of record

Anadarko E&P Company LP

Houston, TX · P-5 Y, filed Jul 4, 2025 · 2,635 permits on file · (832) 636-1111

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko E&P Company LP
Production reportsSN EF Maverick, LLCthrough Apr 2019
Latest permitAnadarko E&P Company LPJul 22, 2010

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,500
total depth, ft
1
permits on file
Jul 22, 2010
last permit issued
Nov 20, 2010
completed
0
cumulative oil, bbl
298K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Nov 20, 2010
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tovar West-Lloyd 75 a Unit G-1-264810Briscoe Ranch (Eagleford)Javelin Energy Partners Mgmt LLC10298KNov 2010 – Jul 2026
Tovar West-Lloyd 75 a Unit O-1-15283Briscoe Ranch (Eagleford)Anadarko E&P Company LP100Nov 2010 – Nov 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko E&P Company LPNov 2011 → Dec 2012
  2. 2Anadarko E&P Onshore LLCJan 2013 → Feb 2017
  3. 3SN EF Maverick, LLCMar 2017 → Apr 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
699355-99DrillAnadarko E&P Company LPJul 21, 2010Jul 22, 2010Aug 28, 20106,500

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-1-264810————
—— O-1-15283————

Formation tops

As filed on W-2/G-1. Subsea from 753 ft elevation.Download CSV →

FormationMD ftSubsea
San Miguel3,350-2,597
Pecan Gap3,800-3,047
Eagle FordEAGLEFORD5,058-4,305

Perforations

Perforated and open-hole intervals.

FromToType
5,7259,580Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6251,36512.25645 S
5.59,5708.752,130 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 8, 2012Dec 22, 2011—
00May 19, 2011Jan 10, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32333360, documented in the API reference.