WELL · 42-325-30954 · DISTRICT 1

Gray Clara Unit -1- #E-3

Plugged

Medina County · Taylor-Ina field  · Vertical

Gray Clara Unit -1- #E-3 (API 42-325-30954) is a plugged well in Medina County, plugged September 22, 1986, last operated by Production Resources Inc..

The RRC has issued one drilling permit, issued September 7, 1978, permitted to 1,000 ft.

It was permitted by Tex-East Petroleum Corp. and has since transferred to Production Resources Inc. on the wellbore schedule.

Operator of record

Production Resources Inc.

Permitted by Tex-East Petroleum Corp.; the EWA schedule now lists a different operator.

Castroville, TX · P-5 Y, filed Nov 4, 2025 · 56 permits on file · (210) 330-1026

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleProduction Resources Inc.
Production reportsnone
Latest permitTex-East Petroleum Corp.Sep 7, 1978

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

1,000
total depth, ft
1
permits on file
Sep 7, 1978
last permit issued
Feb 12, 1979
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 12, 1979
Shut in
—
Plugged
Sep 22, 1986

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
32118-99DrillTex-East Petroleum Corp.Sep 7, 1978Sep 7, 1978—1,000

Perforations

Perforated and open-hole intervals.

FromToType
—848Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
1773——
5.5798—194 S
2.875798——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 12, 1984Feb 20, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
0
bbl, all reported
Dec 1985
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000001477H-1 InjectionPlugged Nov 3, 1986200450810–1,000

MONTHLY INJECTED, BBL · H-10 · LAST 1 REPORTED MONTHS

Last 12 months 0

01

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/32530954, documented in the API reference.