WELL · 42-325-31623 · DISTRICT 1
Bailey James & Regina #9
Medina County · Taylor-Ina field · NO Production · Vertical
Bailey James & Regina #9 (API 42-325-31623) is a well in Medina County operated by Cvs Production LLC., completed March 3, 1981 and listed as no production on the RRC schedule.
The RRC has issued one drilling permit, issued February 20, 1981, permitted to 1,050 ft.
It was permitted by Shaw Production, Limited and has since transferred to Cvs Production LLC. on the wellbore schedule.
Its lease has reported 7.7K barrels of oil and 21 mcf of gas since January 1993, last reporting in July 2026. The lease carries 3 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Shaw Production, Limited; the EWA schedule now lists a different operator.
Plano, TX · P-5 Y, filed Jul 4, 2026 · (214) 287-5617
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | CVS Production LLC. |
| Production reports | CVS Production, LLC.through Dec 2017 |
| Latest permit | Shaw Production, LimitedFeb 20, 1981 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 1,050
- total depth, ft
- 1
- permits on file
- Feb 20, 1981
- last permit issued
- Mar 3, 1981
- completed
- 7.7K
- cumulative oil, bbl
- 21
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Mar 3, 1981
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Delinquent
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Bailey, James & Regina O-1-7061 | Taylor-Ina | CVS Production, LLC. | 3 | 7.7K | 21 | Jan 1993 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1V/J Oil CompanyJan 1993 → Aug 1995
- 2United Petroleum TechnologiesSep 1995 → Aug 2001
- 3Faseler, HerbSep 2001 → Dec 2003
- 4Alberta Energy Recovery, Ltd.Apr 2004 → Feb 2006
- 5D & B Energy CorporationMar 2006 → Apr 2008
- 6CVS Production, LLC.May 2008 → Dec 2017
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 109811-99 | Drill | Shaw Production, Limited | Feb 20, 1981 | Feb 20, 1981 | — | 1,050 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-1-7061 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 876 | 880 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 2.375 | 861 | — | — |
| 4.5 | 925 | 6.25 | 100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 12, 1984 | Jun 11, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-325-31623 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-325-31623 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32531623, documented in the API reference.