WELL · 42-325-32615 · DISTRICT 1
Tschirhart, Roy J. #1A
Medina County · Vertical
Tschirhart, Roy J. #1A (API 42-325-32615) is a plugged well in Medina County, plugged January 22, 1988, last operated by Roca Energy.
The RRC has issued one drilling permit, issued May 11, 1983, permitted to 1,500 ft.
Operator of record
Hurst, TX · P-5 Y, filed Oct 15, 1984 · 7 permits on file
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | none |
| Production reports | none |
| Latest permit | Roca EnergyMay 11, 1983 |
- 1,500
- total depth, ft
- 1
- permits on file
- May 11, 1983
- last permit issued
- —
- completed
- —
- cumulative oil, bbl
- —
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- —
- Shut in
- —
- Plugged
- Jan 22, 1988
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Only the permit record exists for this well so far, here and in the RRC's wellbore query. Completion reports, formation tops, lease production, and the scanned filings appear once the operator files a completion report, typically months after drilling. Petrora refreshes the wellbore file weekly, so a filing from the last few days may reach the RRC before it shows here. How long each source takes →
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 195573-99 | Drill | Roca Energy | May 11, 1983 | May 11, 1983 | May 11, 1983 | 1,500 |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-325-32615 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-325-32615 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/32532615, documented in the API reference.